Verifying The Installation - Huawei FusionCol8000-E140 Quick Manual

Modular indirect evaporative cooling system
Table of Contents

Advertisement

FusionCol8000-E140 Modular Indirect Evaporative
Cooling System
Quick Guide (2021, Ireland)
Figure 1-29 Connecting communications cables
----End

1.5 Verifying the Installation

Table 1-7 System checklist
Check
Item
Unit
Fan
Water
system
Issue 02 (2023-08-03)
NO TE
If the Modbus-TCP/SNMP protocol is used, customers can purchase the NetEco (a LAN
switch is required) or a third-party NMS as the monitoring system.
Expected Result
The unit is installed properly without any tilt.
The foreign matter inside the cabinet such as
desiccants, cable ties, stubs, dust, iron chips,
copper wires, and aluminum chips are
cleaned up.
The fan is secured.
The fan has no foreign matter inside.
The fan blades rotate properly.
The water pump is secured reliably and
steadily.
The water filter is secured reliably and
steadily.
The rubber bands of floats are removed. The
float is secured. The sheet metal fasteners
are secured reliably.
The floats move smoothly.
The water inlet pipe is connected securely
without leakage.
Copyright © Huawei Digital Power Technologies Co., Ltd.
1 System Installation
Actual Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed