Pioneer QUANTUM INVERTER Series Service & Troubleshooting Manual page 44

Hide thumbs Also See for QUANTUM INVERTER Series:
Table of Contents

Advertisement

Procedure:
1.
Tighten the flare nuts of the indoor and outdoor
units, and confirm that both the 2- and 3-way valves
are closed.
2.
Connect the charge hose with the push pin of Handle
Lo to the gas service port of the 3-way valve.
3.
Connect another charge hose to the vacuum pump.
4.
Fully open the Handle Lo manifold valve.
5.
Using the vacuum pump, evacuate the system for
30 minutes.
a. Check whether the compound meter indicates
-0.1 MPa (14.5 Psi).
• If the meter does not indicate -0.1 MPa
(14.5 Psi) after 30 minutes, continue
evacuating for an additional 20 minutes.
• If the pressure does not achieve -0.1 MPa
(14.5 Psi) after 50 minutes, check for leakage.
b. Wait for 5 minutes, then check whether the gauge
6.
Loosen the flare nut of the 3-way valve for 6 or
7 seconds, and then tighten the flare nut again.
a. Confirm the pressure display in the pressure
b. Remove the charge hose from the 3-way valve.
7.
Fully open the 2- and 3-way valves and tighten the
cap of the 2- and 3-way valves.
Maintenance
3
• If the pressure successfully reaches -0.1 MPa
(14.5 Psi), fully close the Handle Lo valve, then
cease vacuum pump operations.
needle moves after turning off the vacuum pump.
If the gauge needle moves backward, check
whether there is any gas leakage.
indicator is slightly higher than the atmospheric
pressure.

Advertisement

Table of Contents
loading

Table of Contents