Setup; Installing The Grinder Control Lever; Checking The Fluid Levels; Charging The Battery - Toro 23208HD Operator's Manual

Stump grinder
Table of Contents

Advertisement

Setup

Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
1
Installing the Grinder
Control Lever
Parts needed for this procedure:
1
Grinder control lever
1
Jam nut
Procedure
1.
Thread the jam nut onto the grinder control lever
(Figure
3).
1. Grinder control lever
2. Jam nut
Description
Grinder control lever
Jam nut
No parts required
No parts required
Figure 3
3. 4-pin connector
Qty.
1
1
2.
Thread the grinder control lever into the
receptacle on the control panel
3.
With the trigger oriented forward, tighten the jam
nut against the receptacle to secure the lever in
place
(Figure
4.
Connect the wire on the lever to the 4-pin
connector under the control panel
2

Checking the Fluid Levels

No Parts Required
Procedure
Before starting the engine for the first time, check
the engine-oil and hydraulic-fluid levels. Refer to the
following sections for more information:
Checking the Engine-Oil Level (page 24)
Checking the Hydraulic-Fluid Level (page 37)
3

Charging the Battery

No Parts Required
g013175
Procedure
Charge the battery; refer to
(page 29)
for more information.
8
Use
Install the grinder control lever.
Check the fluid levels.
Charge the battery.
(Figure
3).
Charging the Battery
3).
(Figure
3).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stx-262320823208g

Table of Contents