INSTALLATION
18
• CBGZ2414S
• CBGZ3016S
Ring of Panel
c
By-pass Screw
e
Tap
g
CAUTION
• Do not dismantle the tap shaft: in the event of a
malfunction, change the whole tap.
• Before placing the burners back on the top
place, make sure that the injector is not blocked.
• A full operational test and a test for possible
leakages must be carried out after gas
conversion (such as soap water or gas detector).
• After completing conversion, a qualified
technician or installer has to mark "V" on the
right gas category to match with the setting in
rating label. Remove the previous setting "V"
mark.