2. UNPACKING & MACHINE INSTALLATION

2-1 Unpacking

When the machine has arrived, first, please check to see if the wooden crate
damaged or not? Secondly, open the crate and inspect the machine for any damage or shortage
of accessories. If so, please contact our company or insurance company immediately in order
to get the best solution; otherwise our company or the insurance company will not be able to
compensate for the damage.

2-2 Lifting

Please refer to figure 2-2 for machine unloading and moving.
The steps for lifting the lathe are:
(1) Clamp the bedways with a specially made hanger, which consists of a clamp and a wire
rope.
(2) Raise the lathe a little bit with overhead crane, and then check to see if the lathe is
balanced. If not, please slide hanger's position left or right to achieve machine's balance.
(3) When the machine arrives at the location, slowly put down the machine to the floor.
Please avoid bumps or crash to ensure machine's accuracy is not altered.
(4) For easier access to the electrical cabinet, the back side of the lathe or cover of the electric
cabinet should be at least 600mm (2 feet) from wall.