Wiring An Svi1000 Unit - GE BAKER HUGHES Masoneilan SVi 1000 Quick Start Manual

Table of Contents

Advertisement

Wiring an SVi1000 Unit

Tools required:
To connect:
CAUTION
CAUTION
1. Loosen the four (4) cover screws and remove the SVi1000 cover (Figure 18).
34 | =BHGE
Wire stripper
Flat head screwdrivers for cover and connectors
For proper operation, maintain signal polarity + and -
respectively.
You must read Appendix B "Optional Switch Load Limits" on page
59 before proceeding. The load across these switches must
conform to the limits described in that discussion.
Figure 18 Front Cover
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents