Haier GE UVC9420 Installation Instructions Manual page 5

Custom insert hood
Table of Contents

Advertisement

Installation Preparation - UVC 9480
CABINET STRUCTURE
It is required two 2 x 4 horizontal studs separated
by 39" as part of the cabinet. They must be firmly
secured to the cabinet structure.
The cabinet bottom must be made from a wooden
surface ¾" minimum thickness.
C L
Make sure the studs and cabinet
bottom surface are firmly secured and able to
withstand 100 pounds.
CABINET PREPARATION
Side Panel
49-2000930 Rev. 1
2" Min.
2" Min.
39" Between
Studs
C L
FRONT VIEW
CUSTOM CABINET FRAME
The custom canopy or cabinet must have a
rectangular opening to accommodate the custom
hood insert by itself. This opening has the same
size for both a wall installation or an island
installation. Ensure parallelism and levelness of
the cabinet so that it doesn't affect flushness of
the hood with the cabinet.
21-1/4"
between studs
cutout width
13" from
bottom of
cabinet to
bottom of
house duct
Side Panel
C L
39"
45"
7-5/8"
C L
18-1/2" Min.
15"
SIDE VIEW
Front of
opening
must be 2"
minimum
from cabinet
front
Back of
opening
must be 2"
minimum
from back
wall
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge uvc9480

Table of Contents