Cabinet Structure; Cabinet Preparation - Haier GE UVC9420 Installation Instructions Manual

Custom insert hood
Table of Contents

Advertisement

CABINET STRUCTURE

It is required two 2 x 4 horizontal studs separated
by 39" as part of the cabinet. They must be firmly
secured to the cabinet structure.
The cabinet bottom must be made from a wooden
surface ¾" minimum thickness.
bottom surface are firmly secured and able to
withstand 100 pounds.

CABINET PREPARATION

12
Installation Preparation - UVC 9420
2" Min.
2" Min.
39" Between
Studs
Make sure the studs and cabinet
C L
FRONT VIEW
CUSTOM CABINET FRAME
The custom canopy or cabinet must have a
rectangular opening to accommodate the custom
hood insert by itself. This opening has the same
size for both a wall installation or an island
installation. Ensure parallelism and levelness of
the cabinet so that it doesn't affect flushness of
the hood with the cabinet.
21-1/4"
39"
13" from
bottom of
cabinet to
bottom of
house duct
Front of
opening is
recommended
to be 2"
minimum from
cabinet front
Back of
opening is
recommended
to be 2"
minimum from
back wall
7-5/8"
C L
18-1/2" Min.
15"
SIDE VIEW
49-2000930 Rev. 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge uvc9480

Table of Contents