Download Print this page

GE AKD-8 Operation And Maintenance Manual page 6

Low voltage switchgear remote racking operator, for akr circuit breakers 115 vac, 60/50 hertz

Advertisement

Installation of the AKR 30S Remote Racker
Mounting Bracket Kit – AKR30SEGBRMOD
Locate the (2) 3/8 inch bolts on the right side of
the frame under the racking mechanism
assembly. Carefully loosen these two bolts in
order to slide the remote racking bracket
(supplied with kit) behind the lock washer that is
on the bolt. See below for location of the bolt
heads on the breaker frame. Be careful not to
remove these bolts.
Mounting Bracket
AKR 30S Mounting Bracket Installation
Remote Racking Operator for AKR Breakers
Slide the bracket behind the lock washers on to
the bolts and then retorque the bolts to 25 – 35
ft.-lbs. Do not over torque. Check to see that
the bracket is completely vertical before
tightening.
alignment of the remote racking shaft.
breaker may now be reinstalled into the cubicle.
The existing racking screw mechanism needs to
be inspected for excessive wear and be
properly lubricated.
Loosen these (2) bolts
Figure 3
6
If not, this will cause improper
The

Advertisement

loading

This manual is also suitable for:

Akregrr