Low voltage switchgear remote racking operator, for akr circuit breakers 115 vac, 60/50 hertz

Advertisement

3. Drill (1) 0.251"
diameter hole
through the door.
2. Drill (1) 1.75"
diameter hole
through the door.
1. Place the bottom flange of the template
above the bottom edge of the door cutout. Both
press studs will be on the inside of the cutout.
Door drilling template for AKR 30/50 doors.
Remote Racking Operator for AKR Breakers
Existing AKR 30/50 breaker door.
Figure 8
13