9 Final tests
•
Remove the measurement devices.
PMF Operating problems
•
Were there any operating problems during the checks?
PMP Covers
•
Attach all removed covers. Check that all covers are complete and firmly seated, including the
cable ducts.
SIE
Protective conductor test
•
Perform the protective conductor test.
PMP Cleaning / Damaged paint
•
Clean the unit using the materials recommended in the Instructions for use and repair any
damaged paint.
•
System ON.
QSQ Final test exposure
•
Take one final test exposure.
MAMMOMAT Balance
Maintenance Instructions
SPB7-115.831.01
Page 21 of 22
Rev.01
05.04
9 Final tests
Siemens AG
Medical Solutions