Huawei FDT2108D-288 Quick Installation Manual page 23

Table of Contents

Advertisement

FDT2108D-288&576
Quick Installation Guide
Step 4 After the optical fibers are spliced and passed the check, fit fiber splice protectors on the fiber
splice holder, coil the optical fibers as described in
tubes with cable ties.
After the fiber splice protectors are secured, ensure that the bare fibers at both ends are
loosely arranged to avoid fiber damage.
Step 5 Close the cover of the straight splicing tray, and insert the straight splicing tray back into the
subrack.
----End
Issue 02 (2021-06-15)
Copyright © Huawei Technologies Co., Ltd.
6 Splicing and Terminating Optical Fibers
Step
2, and secure the fiber protection
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fdt2108d-576

Table of Contents