Instllation Procedure
Installation of the ducts
1
Mounting the ducts directly to the ceiling
・  Use the tapping screws included with the
   ducts to mount the ducts directly to the ceiling(or wall).
Caution
Fix the duct to building structure firmly.
It will become a cause of fall if it does not so.
・Use all of the mounting holes.
Notes
Do not attach the plug unit with the place where  
● 
the tapping screws were mounted.
・Screw one screw partway in, fit the elongated hole of
 the duct onto that screw, and then screw the other
 screw in through the round hole in the duct. This allows
 the installation to be completed by one person.
Mounting the pipe-suspended hangers 1
2
・Use this procedure if the Factory Line 20 ducts
 are to be suspended from pipes, If necessary, the
 pipes can be shortened to the required length by
 cutting them at the flange end.
66.7
Flange mounting dimensions
Flange
Unit : mm
Round hole
L=1m
L=2m
L=3m
Support spacing for the duct
・The standard interval for mounting of the hangers is 1 m, and the maximum
   interval is 1.5 m. Be sure to mount securely to a structural member.
Caution
Ensure the strength of building structures enough to support 
the hanging weight (a maximum of 10kg per support).
 Not doing so may cause the hanger to drop.
Use two or more pieces of hanger for one duct.
 I It will become a cause of fall if it does not so.
To prevent the ducts from meandering, align the hanger centers.
 Not doing so may cause the hangers to drop.
Installation the flanges
1.Turn the flange cover to the left to remove it.
2.Use the wood screw or tapping screw ,then mount the flange to a
structural member.
3.Align the pipe mounting hole of the pipe suspension hanger with the
position of the pan head machine screw to put the pipe in the flange,
and then fasten the pan head machine screw and the setscrew.
(Fasten the pan head machine screw through the pipe mounting hole.)
4.Turn the flange cover to the right to mount it back in its
 original position.
Caution
Securely fasten the wood screw or tapping 
screw, pan head machine screw, and setscrew.
4
33
(Mounting hole)
250
250
500
Elongated hole
750
750
1000
250
Screw in
partway.
Elongated hole
Round hole
the pan head
machine screw
Pipe mounting hole
Dismount
●Adjust the length the pipe-suspended hangers after mounted
・In order to adjust the length after the pipe- suspended
 hangers have been mounted to a structural member,
 loosen the securing screw, remove the pipe, and cut
 the pipe at the flange end.
●After cutting, drill a hole
 ( φ 5.5 mm), mount the
 flange, and then mount a
 pipe to the flange.
Tapping screw(4×25)
Ceiling
250
750
250
Duct
Screw
Structural
Standard 1 m, maximum 1.5 m
member
Ceiling
materialt
Pipe-suspended hanger
Factory Line 20 duct
Flange
Securing screw
Mount
Flange cover
figure 1
figure 2
21.5
φ5.5

Advertisement