Joining The Top And Bottom Housings - GE Dash D 0 0005 G Series Service Manual

Port docking station
Table of Contents

Advertisement

Joining the Top and Bottom Housings

5-6
Field Replaceable Units: Docking Station Assembly
6. Stabilize the LED component and gently insert
7. Route the light pipe as shown to prevent the
8. Position the connector assembly into the bottom
9. Start with the center screw and install the three
10. Replace the equipotential lug.
028A
11. Join the top and bottom housings. See page 5-6.
1. Insert the locking lever spring into the spring
017A
2. Slide and hold the security lever in the unlock
3. Release the security lever and place the top and
4. Hold onto both housings and turn the unit over
029A
5. See
Dash Port Docking Station
2000966-037
the light pipe into the LED component.
light pipe from pulling out of the LED
connector.
housing.
PCB bracket screws.
opening.
position (far left) while inserting the locking
lever pin into the locking assembly.
bottom housing pieces together.
and install the six screws.
"After Reassembly"
the electrical safety tests and checkout
procedures you must complete.
on page 5-3 to identify
Revision B

Advertisement

Table of Contents
loading

Table of Contents