Installation
20.
Remove the cable tie (pos. 1 / Fig. 29). Then place the cable as shown in Fig. 29.
The cable should run underneath the flat conductor cables attached to board D1.
21.
Replace the cable tie (pos. 1 / Fig. 29) and make sure the cables run tightly
together.
22.
Remove the cable tie (pos. 1 / Fig. 30).
23.
Pin plug K23 is threaded through the hole (pos. 2 / Fig. 30).
24.
Replace the cable tie (pos. 1 / Fig. 30). Make sure there is no slack.
25.
Connect pin plug K23 to pin plug K23 of the cable of the new power supply unit.
26.
Continue installation under section "Final assembly".
Siemens AG
Medical Solutions
1
Fig. 29 Placing cable
1
2
Fig. 30 Threading cable
SPR8-220.031.04
Rev. 04
K9
D1
Page 23 of 30
09.03
CS PS 24
2 - 23
MOBILETT Plus/ -E/ -HP