2-1-4. Cleaning/Replacement of Main Roller
(1) Remove the lid, then pull out the roller shaft (A)
assembly.
(2) Remove the main roller in the direction indicated by
the arrow.
(3) Clean the main roller with a cleaning cloth moistended
with cleaning liquid.
Roller shaft (A) assembly
Main roller
(4) Attach a new main roller in the reverse order of steps
(1) and (2).
UYA-S90SF
2-2. Carrier Assembly
2-2-1. Main Parts Location
Lid
2-2-2. Replacement of Main Parts
1. Removal of Plate Rock Assembly
Remove the eight screws, then remove the plate rock
assembly.
SE-562 board
SE-563 board
Stepping motor
BTP 2x5
BTP 2x5
SE-561 board
CN-1959 board
Plate rock assembly
2-5 (E)