3.1.2 Downflow Layout Requirements

Figure 3-2 System layout diagram
(A) Chilled water inlet
(2) Water filter
(5) Chilled water valve

3.1.3 Pipe Layout Requirements

Issue 07 (2021-12-30)
NO TE
● Components shown by (5) and (6) in the preceding figure are delivered with the smart
cooling product. Other components need to be purchased and installed onsite. Do not
install the other components directly under the cabinet.
● A water filter with 20 meshes and pressure resistance of 1.6 MPa or higher is
recommended onsite. Pressure resistance of the water filter is determined by site
requirements. Install the water filter on the external water inlet pipe near the smart
cooling product.
● Ensure that the effective displacement of the flexible connection is greater than or equal
to 30 mm.
NO TE
● Components shown by (5) and (6) in the preceding figure are delivered with the smart
cooling product. Other components need to be purchased and installed onsite. Do not
install the other components directly under the cabinet.
● A water filter with 20 meshes and pressure resistance of 1.6 MPa or higher is
recommended onsite. Pressure resistance of the water filter is determined by site
requirements. Install the water filter on the external water inlet pipe near the smart
cooling product.
Copyright © Huawei Technologies Co., Ltd.
(B) Chilled water outlet
(3) Isolation valve
(6) Heat exchanger
3 Installation
(1) Balance valve or isolation
valve
(4) Flexible connection
(7) External components
31