Beko BEKOMAT 8 Installation And Operation Manual page 17

Hide thumbs Also See for BEKOMAT 8:
Table of Contents

Advertisement

EN
Oscillator
Sensor
Sensor-Kreis
Sensor loop
MAX
MIN
Mains connection:
Route the cable through the screwed cable gland and connect to terminals L1, N, PE
Alarm tapping:
There is a potential-free alarm relay (changeover) available to forward the alarm in the event of a malfunction:
Route the cable through the second screwed cable gland and connect it
N.C. – COM:
Contact closed in the event of a malfunction or power failure (fail-safe principle)
N.O. – COM:
Contact opened in the event of a malfunction or power failure
Tighten screwed cable gland(s)
in place, check correct fit and tighten the screws
Set the top cover
BEKOMAT
8/9
®
Netzteil
Power supply
Zeitauswertung
Ventilsteuerung
Time analysis
Valve control
Alarmkontrolle
Alarm monitoring
Installation and operation manual
L1
1.D
Netzanschluss
N
1.1
Power
PE
Gehäuse Housing
PE
PE
Magnetventil
N
2.0
Solenoid valve
V1
2.1
N.C
3.0
Alarmkontakt
COM
3.1
Alarm contact
3.2
N.O
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 9

Table of Contents