Dc Link Cable Connection - Samsung 93PM Installation Manual

Table of Contents

Advertisement

.
3
Installing the Product

3.10.10 DC Link Cable Connection

1. Connect the ground cables.
NOTICE
Connect the rack ground wire with an M12
factory-provided and must be provided by the installer or customer.
The fastening torque should be 30Nm
100
Figure 3-131: Grounding Points (2 EA)
screw.
(300kgf∙cm).
45 mm Pitch
Between Holes
Rack ground screws and cables are not
English 8/2020. Rev 0.3

Advertisement

Table of Contents
loading

This manual is also suitable for:

9395c9395p9395

Table of Contents