Samsung 93PM Installation Manual page 107

Table of Contents

Advertisement

.
3
Installing the Product
Signal Cabling Examples of Left Alignment of Trays (System BMS on the left)
Figure 3-111: Signal Cabling Examples of Left Alignment of SMU
19.
Turn the termination resistor switch on for the last SMU in the CANbus loop.
English 8/2020. Rev 0.3
89

Advertisement

Table of Contents
loading

This manual is also suitable for:

9395c9395p9395

Table of Contents