Huawei SUN2000-3KTL-M1 Quick Manual

Huawei SUN2000-3KTL-M1 Quick Manual

Hide thumbs Also See for SUN2000-3KTL-M1:

Advertisement

SUN2000-(3KTL-12KTL)-M1
Quick Guide
Issue: 01
Part Number: 31508308
Date: 2020-09-15
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SUN2000-3KTL-M1

  • Page 1 SUN2000-(3KTL-12KTL)-M1 Quick Guide Issue: 01 Part Number: 31508308 Date: 2020-09-15 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Product Description

    5. Use insulating tools when installing the device. For personal safety, wear proper personal protective equipment (PPE). 6. Huawei shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Page 3: Installing The Equipment

    Installing the Equipment Installation Requirements Angle Space Dimensions Two M6 screw holes are reserved on both left and right sides of the inverter for installing an awning.
  • Page 4: Installing The Inverter

    Installing the Inverter When drilling holes, avoid the water pipes and power cables buried in the wall. 1. Install the mounting bracket. • M6x60 expansion bolts are delivered with the inverter. If the length and number of the bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts by yourself. •...
  • Page 5: Electrical Connections

    3. Install the inverter on the mounting bracket. 4. (Optional) Install an anti-theft lock. Prepare an anti-theft lock suitable for the lock hole diameter (Ф8 mm) and ensure that the lock can be installed successfully. An outdoor waterproof lock is recommended. Electrical Connections Preparing for Installation •...
  • Page 6 Installing the PE Cable Do not connect the neutral wire to the enclosure as a PE cable. Otherwise, electric shocks may occur. • The PE point at the AC output port is used only as a PE equipotential point, and cannot substitute for the PE point on the enclosure.
  • Page 7 Five-Core Cable (L1, L2, L3, N, and PE) • This section describes how to connect a five-core AC output power cable to an AC connector. A three-core AC output power cable can be connected similarly. The three-core cable (L1, L2, •...
  • Page 8 Installing the DC Input Power Cable 1. Ensure that the PV module output is well insulated to ground. 2. Use the Staubli MC4 positive and negative metal terminals and DC connectors supplied with the solar inverter. Using incompatible positive and negative metal terminals and DC connectors may result in serious consequences.
  • Page 9 2. Connect DC input power cables. DC input terminals Pull the DC input power cable back to ensure that it is connected securely. Click (Optional) Installing Battery Cables • Use insulated tools when connecting cables. • Connect battery cables with correct polarity. If battery cables are reversely connected, the solar inverter may be damaged.
  • Page 10 Installing the Smart Dongle • If FE communication is used, install a WLAN-FE Smart Dongle (SDongleA-05). The WLAN-FE Smart Dongle is delivered with the SUN2000. • If 4G communication is used, install a 4G Smart Dongle (SDongleA-03). You need to purchase the 4G Smart Dongle by yourself.
  • Page 11 (Optional) 4G Smart Dongle (4G Communication) • If your Smart Dongle is not equipped with a SIM card, prepare a standard SIM card (size: 25 mm x 15 mm) with the capacity greater than or equal to 64 KB. • Install the SIM card in the arrow direction.
  • Page 12 • When the RS485 communications cables of devices such as the Smart Power Sensor and the energy storage device are both connected to the inverter, 485A2 (pin 7), 485B2 (pin 9), and PE (pin 5) are shared. • When the enable signal cable of the energy storage device and the signal cable of the rapid shutdown switch are both connected to the inverter, GND (pin 13) is shared.
  • Page 13 In the Smart Dongle networking scenario, the SmartLogger cannot be connected. • The Smart Power Sensor is necessary for export limitation. Only the DTSU666-H Smart Power Sensor (provided by Huawei) can be used. • A maximum of 10 devices can be connected to the WLAN-FE and 4G Smart Dongles. The Smart Power Sensors connected to the RS485A2 and RS485B2 ports are not included.
  • Page 14 (Optional) Installing the RS485 Communications Cable (Inverter Cascading) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the communication port. Communications port (COM)
  • Page 15 (Optional) Installing the RS485 Communications Cable (Only Smart Power Sensor Connected) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the communication port. Communications port (COM)
  • Page 16 (Optional) Installing the RS485 Communications Cable (Smart Power Sensor and Energy Storage Device Connected) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communications port (COM)
  • Page 17 (Optional) Installing the Grid Scheduling Dry Contact Signal Cable 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communications port (COM)
  • Page 18 (Optional) Installing Signal Cables for a Smart Backup Box 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communications port (COM)
  • Page 19: Verifying Installation

    Verifying Installation Acceptance Criteria The inverter is installed correctly and securely. Cables are routed properly as required by the customer. The Smart Dongle is installed correctly and securely. Cable ties are evenly distributed and no burr exists. The PE cable is connected correctly, securely, and reliably. The DC switch and all the switches connected to the inverter are set to the OFF position.
  • Page 20 6. Observe the LEDs to check the operating status of the inverter. Type Status (Blinking at long intervals: On Meaning for 1s and then Off for 1s; Blinking at short Intervals: On for 0.2s and then Off for 0.2s) Running indication Steady green Steady green...
  • Page 21 7. (Optional) Observe the LED to check the operating status of the Smart Dongle. WLAN-FE Smart Dongle Description Color Status Yellow (blinking Steady on The Dongle is secured and green and red powered on. simultaneously) Blinking at short The parameters for connecting intervals (on for 0.2s to the router are to be set.
  • Page 22 FusionSolar app as an example to describe the commissioning method. For the SUN2000 app, perform operations as required. • Search for "SUN2000" in Huawei AppGallery, download the latest installation package, and install the SUN2000 app by following the instructions. The SUN2000 app version should be 3.2.00.005 (Android) or later.
  • Page 23 To create multiple installer accounts for a company, log in to the FusionSolar app and tap New User to create an installer account. Installer Creating a PV Plant and a Plant Owner For details, see the FusionSolar App Quick Guide .
  • Page 24 PV plant as prompted. 2. Log in to https://intl.fusionsolar.huawei.com to access the WebUI of the FusionSolar Smart PV Management System. On the Homepage page, click the plant name to go to the plant page.
  • Page 25 You can also upload the physical layout template photo on the WebUI as follows: Log in to https://intl.fusionsolar.huawei.com to access the WebUI of the FusionSolar Smart PV Management System. On the home page, click the plant name to go to the plant page. Choose Plant layout, click Add Physical Layout >...
  • Page 26 Distributed PV Plants Connecting to Huawei Hosting Cloud Quick Guide For details, see the (Distributed Solar Inverters + SmartLogger1000A + RS485 Networking) PV Plants Connecting to Huawei Hosting Cloud Quick Guide (Inverters + SmartLogger3000 + RS485 Networking) . You can scan the QR codes to obtain the documents. SmartLogger1000A...
  • Page 27 2. Connect to the solar inverter WLAN and log in as installer to access the device commissioning screen. Resetting the Password 1. Ensure that the SUN2000 connects to the AC and DC power supplies at the same time. Indicators are steady green or blink at long intervals for more than 3 minutes. 2.
  • Page 28: Customer Service Contact

    Customer Service Contact Region Country Phone Service Support Email France Germany Spain eu_inverter_support@huawei.com 0080033888888 Europe Italy Netherlands Other countries For details, see solar.huawei.com. Australia au_inverter_support@huawei.com 1800046639 Turkey tr_inverter_support@huawei.com 0080021686868 Malaysia /1800220036 (+66) 26542662 (charged apsupport@huawei.com Asia Pacific by local call) Thailand...
  • Page 29 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China solar.huawei.com...

Table of Contents