Inserting the new module:
•
Unpack the new module from the transport box and insert it into the corresponding slot position.
•
Switch on the power supply (move the switch S1 on the CSPi module into upper position).
•
Close the cover of the CFS-2 modules.
[sccovsic-110111-01.tif, 1, en_US]
In case of exchanging an existing module, the system should work after the power supply is enabled. When
inserting a new module the first time, the system needs a new commissioning (configuration, level setting
etc.).
Please refer to the corresponding instructions in chapter Commissioning of the Power Link 50/100 equipment
manual!
Smart Communications, PowerLink 100 and PowerLink 50, Product Information
E50405-U53-X-B3-7670, Edition 11.2014
Commissioning
6.4 Mounting of Modules in the PowerLink
47