Siemens 1D Series Operating Manual page 3

Synchronous generator
Table of Contents

Advertisement

s
Rev.
A
4.2.6 Fill the bearings with oil, oil cleanliness
3.2.5 Anticorrosion treatment of machined parts and bearings
B
C
4.2.12 Checking the insulation resistance of stator winding
4.2.13 Insulation test for stator winding
D
3.3 Storage with shaft in horizontal position
3.4 Putting into operation after storage period
E
Product documentation 1D 3.8.en
Revised items
3.2 Storage conditions
4.2.9 Alignment (rolling bearings)
4.2.10 Alignment (slide bearings)
4.2.14 Drying
4.4.1 Installation
3.5 Sealed packings
3.6 Inspection intervals during storage
3.7 Control check during storage
Rev. E, 10/13
Date
Name
22.02.13
Vesely
07.03.13
Pochop
14.03.13
Pochop
05.09.13
Vesely
07.10.13
Pochop
page 3/42

Advertisement

Table of Contents
loading

This manual is also suitable for:

1t series1dv series

Table of Contents