GE eBike Service Manual page 25

Hide thumbs Also See for eBike:
Table of Contents

Advertisement

i. Remove Steering Column (incl. laying cables)
Before the steering column and the cables (spiral hose + cable connecting control terminal to PCB
Interface) can be removed, PCB Interface, the pneumatic system of the BP module and the power
supply must be removed.
Remove the control terminal.
Disconnect the cable connecting the control terminal
to PCB Interface Messkopf X150.
Disconnect NIBP tubing.
Open cable ties of connection cable and spiral hose
(see illustrations).
Pull connection cable and spiral hose towards the
steering column.
Loosen clamping lever (eBike comfort) securing the
handlebar or
loosen fixation of the steering column (eBike basic).
Caution: ultra-tight screw lock.
In each case take care not to drop the clamping plate.
Lift off the steering column.
Note:
When installing the steering column with the spiral hose and
connection cable, cable and hose must be slack and secured
with cable ties (see illustrations).
j. Remove Drive Unit
Disconnect connection cable of PCB RPM X200 from PCB Interface.
Unscrew the 6 screws (M8x20) of the drive unit
and lower the drive unit.
k. Remove PCB RPM
Disconnect the PCB RPM cable J3.
Remove connection J5 to strain gauge.
Unscrew the two screws of PCB RPM.
Disconnect the two cables (red + blue) to the eddy-current brake.
2018112-003 Rev J
B: Mechanical Design
eBike, eBike L, eBike EL
- 19 -

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ebike lEbike el

Table of Contents