Installing Equipment In The Rack; Location Of The 5-Port Pdu - Huawei RP100 Commissioning Manual

Room presence
Hide thumbs Also See for RP100:
Table of Contents

Advertisement

HUAWEI RP100&RP200 Room Presence
Commissioning Guide
3.
Figure 3-40 Strapping the composite cable
----End

3.6 Installing Equipment in the Rack

3.6.1 Location of the 5-Port PDU

The 5-port power distribution unit (PDU) is embedded in the rack, as shown in
You do not need to install it.
Issue 01 (2015-02-12)
NOTICE
l Use the cable tie to hold the ferrite bead to protect the cable from falling off.
l Do not tightly fasten the cable tie; otherwise, the cable core may be damaged.
Strap the TE40 composite cable to the rack using a cable tie, as shown in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Figure
3-40.
Figure
3-41.
42

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rp200Rp100-46sRp100-55sRp200-46sRp200-55s

Table of Contents