Huawei FusionModule1000A20 Installation Manual page 23

It solution
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 IT Solution
Installation Guide (2016.05, AI Version)
Context
Figure 5-1 Single-capacity base (unit: mm)
Preparations
Tools: torque wrench, adjustable wrench, height gauge (or another instrument with similar
functions), level (or leveling pipe), straight steel ruler, hammer drill, right angle, marker, ink
fountain, long steel measuring tape, claw hammer, rubber mallet, vacuum cleaner, protective
gloves
Materials: single-capacity base, expansion bolts, twistlock, 3 mm thick spacers made of
passivated 304 stainless steel or hot-dip Q235 zinc (to be purchased onsite)
Document: container layout diagram
Skill requirement: skilled technicians
Procedure
Step 1 Determine the reference points for installing containers on the concrete platform based on the
site space and the container layout diagram. Then mark the reference points using a marker.
Step 2 Draw the FusionModule1000 installation area on the concrete platform along the reference
points using an ink fountain.
Step 3 Determine the reference points for installing container bases in the FusionModule1000
installation area based on the container layout diagram.
Step 4 Referring to the container layout diagram, draw the longitudinal and latitudinal reference lines
from the center of bases with a straight steel ruler, right angle, and ink fountain.
Step 5 Place bases based on the reference lines.
Issue 02 (2017-01-10)
For the diagram, see the quick installation guide for the solution in use.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing a Container
16

Advertisement

Table of Contents
loading

Table of Contents