ABB +P906 Manual page 14

For ach580-04, acq580-04 and acs580-04 drives
Table of Contents

Advertisement

14 Installation
d) Check the connection labelling for future reference.
1
V20
2
V10
e) Disconnect the cables from the control connections and then carefully remove
them from the drive module via the rubber grommet. Wind the cables carefully into
the plastic bag supplied, ready for installation later.
4. Remove the drive module from the packing carton. Continue with:
module installation: see the hardware manual,
installation and connections of the control unit: see section
control unit
on page 15.
3
BPOW
4
BGDR
Installing the external

Advertisement

Table of Contents
loading

Table of Contents