External Applications; Peak Load Signal; Peak Load Prevention; Com Module Selection - Miele PDR 908 HP Marine Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Supervisor level

External applications

Peak load signal

External hardware is connected via the
Miele XCI box.
The peak-load negotiation function
enables the tumble dryer to be con-
nected to an energy management sys-
tem. When a signal is registered, the
tumble dryer's heater is switched off
for a short period or the appliance is
prevented from being switched on.
The tumble dryer may only be oper-
ated with a peak-load system if this
system is connected to the tumble
dryer via the Miele XCI box.
– Factory default: no function
– Peak load with 230 V
– Peak load with 0 V

Peak load prevention

With this function, the application of a
hygiene programme is not amended
when a peak load signal is in place.
The heater stays switched on.
– Factory default: Off
– On
98

COM module selection

This tumble dryer is equipped with an
integrated WiFi module. However, the
dryer can also be equipped with an
external module.
– Off
– Internal module (factory default)
The internal WiFi module is used.
– External module
An XKM module or RS232 module is
inserted into the module slot.

WiFi

Control the networking of your tumble
dryer.
– Setup
This message only appears if the
tumble dryer has not yet been con-
nected to a WiFi network.
– Deactivate (visible when the network
is activated)
The network remains set up; the WiFi
function is switched off.
– Activate (visible when the network is
deactivated)
The WiFi function is reactivated.
– Connection status (visible when the
network is activated)
The following values are displayed:
– The quality of WiFi reception
– The network name
– The IP address
– Reset (visible when set up)
Resets the WiFi login (network) to im-
mediately re-establish a new connec-
tion.

Advertisement

Table of Contents
loading

Table of Contents