Completing Commissioning - Miele PDR 908 HP Marine Operating And Installation Instructions

Heat-pump dryer
Table of Contents

Advertisement

Setting up a payment system
If you wish to set up a payment system,
read the "Payment system" section of
the "Supervisor level" chapter. These
settings can only be changed during
the initial commissioning process. If you
wish to change the settings after the
commissioning process, please contact
Miele Service.
If you do not wish to set up a payment
system, you can skip this stage.
Payment system
No payment
system
Programme
Timed op. +
control
impul.counter
 Touch the
No payment system
The display will change to the next set-
ting.

Completing commissioning

The commissioning procedure is com-
pleted when a programme lasting
longer than 20 minutes has been car-
ried out in full.
If the power is interrupted prior to the
start of the first drying programme
(e.g. if the machine is switched off
with the  button), the initial commis-
sioning process can be completed
again. Once a drying programme has
been running for over 20 minutes, the
initial commissioning process does
not have to be performed again.
 Confirm with
OK
Timed
COM module
operation
 sensor.
.
Initial commissioning
 In the main menu, touch the  
grammes
Programmes
Automatic
plus
Microfibre
 Select the Timed drying cool air pro-
gramme.
11:02
 Touch the Duration sensor.
Duration
OK
 Place your finger on the number that
you want to change and move your
finger in the direction you want.
 Select a duration of 20 minutes.
 Confirm with
 Touch the flashing Start/Stop sensor.
After this programme has finished, the
tumble dryer is ready for use.
 sensor.
Timed drying
warm air
Timed drying
cool air
02
22
01
21
00
20
h
02
59
01
58
Reset
OK
.
Pro-
11:02
Basket
programme
Basket - Low
temperature
11:02
OK
27

Advertisement

Table of Contents
loading

Table of Contents