ECC800 Data Center Controller
User Manual
2.
3.
6.2 Third-party NMS Management (over SNMP)
6.2.1 Connecting the Communications Cable
Procedure
Step 1 Connect the communications cable to the WAN_1 port on the ECC800.
Figure 6-3 Connecting the communications cable
----End
Issue 02 (2019-02-28)
Click
in the upper left area of the Data Center Planning window to switch to the
Uncreated Device Information window.
Click
in the Uncreated Device Information window to switch to the Add Device
window. You can add an ECC800 device to the specified modular in the Add Device
window. For detailed operations, see Figure 6-2.
Figure 6-2 Adding an ECC800 device to the modular
Click OK, and you can view the task information, including Type, Device Name, Region, Progress,
Status, Start Time, End Time, and Information in the displayed Progress window.
During binding of the ECC800 for the first time, the screen will be locked indefinitely when the
progress bar reaches 30%, and displays Loading device profile. Please try it later. The actual
operation results prevail.
Copyright © Huawei Technologies Co., Ltd.
6 Remote Management
167