Elevating Base; Figure 5-7 Bed Disassembly - GE Giraffe Service Manual

Hide thumbs Also See for Giraffe:
Table of Contents

Advertisement

5.5.4 Elevating Base

Refer to "Figure 5-7 Bed Disassembly", "Figure 5-8 Elevating Base with Two-piece Shroud Assembly", and
"Figure 5-9 Elevating Base with Three-piece Shroud Assembly".
1. Run the elevating base to its top travel limit then switch off and unplug the unit.
2. Remove the mattress, bed, translation deck, tilt platform, and pan.
3. Remove the chassis cover. (Refer to section 5.5.1.)
4. Disconnect the elevating base electrical connector at J-45 on the relay board, and tie a wire to it so you can
fish it back through during reassembly.
5. Connect the replacement elevating base to the relay board, switch the unit back on and using the foot
pedals fully extend the new base. Switch off and unplug the unit.
© 2001 by Datex-Ohmeda, Inc.. All rights reserved.
Mattress
Clear Plate
Rotating bed
Translation deck
Tilt platform
Pan

Figure 5-7 Bed Disassembly

6600-0356-000 103
Chapter 5: Repair Procedures
X-ray tray
Tilt release
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents