Checking The Phase Diode Bridge; Checking The Inverter Compressor Phase Diode Bridge - LG Multi V5 Service Manual

Hide thumbs Also See for Multi V5:
Table of Contents

Advertisement

Checking the Inverter Compressor Phase Diode Bridge

1. Shut off main power. After main power is shut off, wait at least ten (10) minutes until
inverter compressor PCB DC voltage is discharged.
WARNING
After switching off the main power supply and verifying that the DC voltage was discharged, wait
for at least ten (10) minutes before checking the electrical components in the control box. There
is risk of electric shock, physical injury or death.
2. Disconnect all connections to the three-phase diode bridge.
3. Set the multi-tester to diode mode.
4. Measured value must be 0.4V ~ 0.7V as shown in table below.
5. If the measured value is different than what is listed in the table below, set the multi-
6. If the diode bridge is damaged, check if the inverter PCB assembly (IPM) also needs to
be replaced.
Table 64: Checking the Phase Diode Bridge.
Diode Terminal
Tester Terminal
R (~) : Black (-)
S (~) : Black (-)
T (~) : Black (-)
Red (+) and Black (-) are the multi-tester terminals.

CHECKING THE PHASE DIODE BRIDGE

+ Terminal:
- Terminal:
black (-)
red (+)
0.4V ~ 0.7V
-
0.4V ~ 0.7V
-
0.4V ~ 0.7V
-
-
0.4V ~ 0.7V
-
0.4V ~ 0.7V
-
0.4V ~ 0.7V
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
Figure 55:
Bridge.
Figure 56: Location of Phase Diode Bridge Terminals (Appearances Will
Vary Depending on Model).
R
S
T
R
S
T
119

Advertisement

Table of Contents
loading

Table of Contents