Connect the cables to their corresponding busbars. Use cable lugs suitable for M12 bolts.
The required tightening torque is 40 Nm.
•
Feeder cables to busbars U1, V1, W1
•
Motor cables to busbars U2, V2, W2
•
Screen ends of all conductors and the shields of all cables to the PE ground
busbar
•
Ground cable to the PE ground busbar
1
Voltage dividers
2
Motor side terminals
3
Input terminals
4
Cable entry plate (bottom plate)
Terminal compartment with cover plate removed, view from front.
Electrical installation 23
1
2
3
4