Firmly push the handle.
6.
The power supply unit is locked when a "click" is heard.
Connect two power cords.
7.
Use the power cord provided with the standard power supply unit and the one provided
with the optional unit. The AC POWER lamps flash when the power cords are
connected.
Power cord for
power supply unit 1
AC POWER lamps
8.
Power on the server.
The AC POWER lamps go on.
9.
Confirm, by the STATUS lamp or on the POST screen, that there are no errors related
to the power supply units.
See Chapter 6 for details on the error messages.
If the AC POWER lamps are off, reinstall the power supply units. If the same error
message still appears, contact your sales representative.
Power supply unit 1
Power supply unit 2
(Standard)
Power cord for
power supply unit 2
(Option)
Upgrading Your NEC Storage 145