GE C30 Instruction Manual page 55

Controller system ur series
Hide thumbs Also See for C30:
Table of Contents

Advertisement

3 HARDWARE
3.1 DESCRIPTION
3
Figure 3–11: EXAMPLE OF MODULES IN F AND H SLOTS
The torque used to connect the terminal blocks to the back of the relay chassis (screws a, b, c shown) is 9 inch-pounds. For
the connections to the terminal blocks (rows 1 to 8), use a minimum of 17 inch-pounds. During manufacturing, the power
supply and CPU modules are installed in slots B and D of the chassis with 13 inch-pounds of torque on the screws at the
top and bottom of the modules.
GE Multilin
C30 Controller System
3-9

Advertisement

Table of Contents
loading

Table of Contents