LampSite
Installation Guide
Figure 5-33 Installing Extender
----End
5.7 Installing pRRU Cables
This section describes the procedure of installing the pRRU cables.
5.7.1 Cabling Requirements
Cables must be routed according to the specified cabling requirements to prevent signal
interference.
General Requirements for Cable Layout
Bending radius
l
l
l
Cable binding
l
Issue 02 (2014-05-27)
NOTE
If certain cables listed below are not required, skip the requirements for routing these cables.
The bending radius of a 1/4'' jumper, a 1/2'' softer jumper, and a 1/2'' common jumper must
be longer than 35 mm, 50 mm, and 127 mm, respectively.
The bending radius of a power cable is at least three times the diameter of the cable.
The bending radius of a signal cable must be at least five times of the diameter of the cable.
Cables of the same type are bound together.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing a pRRU
77