Huawei LampSite Installation Manual page 71

Hide thumbs Also See for LampSite:
Table of Contents

Advertisement

LampSite
Installation Guide
Figure 5-19 Anchor points of the pRRU installation kits (unit: mm)
(1) Panel
To prevent inhalation or eye contact with dust, take adequate preventive measures when drilling
holes.
Step 3 Use a hammer drill with bit 8 to drill holes at the anchor points.
Step 4 Lead the bolt M6x80 through the panel and daughter board, and tighten the torque screwdriver
to a torque of 5 N•m, as shown in
Issue 02 (2014-05-27)
(2) Plate
CAUTION
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(3) Anchor point
Figure
5-20.
5 Installing a pRRU
66

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents