22
Check the insulation of the motor and the motor
cable.
Connect the power cables.
Connect the control and auxiliary control cables.
Check the installation.
Commission the drive.
Inquiries
Address any inquiries about the product to the local ABB representative, quoting the
type code and serial number of the unit. If the local ABB representative cannot be
contacted, address inquiries to the manufacturing facility.
About this manual
Phone: 800.894.0412 - Fax: 888.723.4773 - Web: www.clrwtr.com - Email: info@clrwtr.com
Task
See
Electrical
installation:
Checking the insulation of
the installation
Electrical installation
Electrical
installation,
Motor control and I/O
board
(RMIO),
Installation of AGPS board
(Prevention of Unexpected Start, +Q950)
the optional module manual delivered with the
module.
Installation checklist
Start-up and
use, appropriate application
program firmware manual
and