ABB PSTX370 Service Manual page 60

Hide thumbs Also See for PSTX370:
Table of Contents

Advertisement

4.
Remove first internal phase bar
1
Loosen (2x)
the first internal phase bar. Note that one screw is
mounted on cooling tower.
5.
Remove angle brackets
1
Loosen (4x)
4
two angle brackets. Note that outer screws of each
bracket are mounted to cooling towers.
6.
Remove bar holder
1
Slightly untighten screw from the middle phase
Hexagon no. 8 M10x40.
2
Loosen (2x)
holder outwards from unit.
Dismantle/assemble current transformers from/to
bar holders as described in chapter 4.4.4.
7.
Place new bar holder
1
Place the new bar holder to the unit and align it
correctly to phases and screw holes. Fasten with
(2x)
Torx 30 M6x16 (8Nm).
2
Fasten the middle phase bar screw
Hexagon no. 8 M10x40 (28Nm).
REASSEMBLE THE SOFTSTARTER
Reassemble the Softstarter as described in
chapter 4.5.4, 1-6.
Service PSTX470...570 | Service Manual |
60
Torx 30 M6x25 and remove
Torx 30 M6x25 and remove the
Torx 30 M6x16 and pull the bar
1SFC13105M0201
4
5
6
7
1
Tx 30
M6 x 25
4.5.2_5
Tx 30
1
M6 x 25
4.5.2_4
Tx 30
M6 x 16
1
Hexagon n. 8
M10x40
2
4.5.2_6
Tx 30
M6 x 16
(8Nm)
2
Hexagon n. 8
M10x40
(28Nm)
1
4.5.2_7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pstx210Pstx470Pstx570

Table of Contents