Acer AT1921 Service Manual page 28

Hide thumbs Also See for AT1921:
Table of Contents

Advertisement

Assembly process
CHECKING THE FOAM AND PUT IT TO
THE PRODUCTION LINE.
CHECKING THE SHIELDING AND
STICK 2*PCS FOAM.
PUT THE FLOW CARD TO THE
BOARD.
SCAN THE FLOW CARD AND CODE OF
P/B INTO THE TMS SYSTEM.
INSERT THE JUMP CABLE INTO THE
P/B AS LEFT SHOW.
CONNECT THE JUMP CABLE AND P/B
WITH WHITE GOOEY
MARK THE LOCATION WITH COLOR
PEN AS LEFT SHOW.
PUT IT TO THE PRODUCTION LINE.
CHECKING THE M/B AND LVDS
CABLE, AND INSERT THE LVDS
CABLE INTO THE JOINT OF M/B.
INSERT THE M/B-P/B CABLE INTO
THE JOINT OF M/B AND P/B.
PUT THE CONNECTED M/B AND P/B
TO THE SHIELDING, THEN PUT IT TO
PRODUCTION LINE.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

At1922

Table of Contents