NEC Exress5800 Series User Manual page 146

Table of Contents

Advertisement

Chapter 2 Preparations
2. With two or more persons, firmly hold the
server and mount it to the rack.
3. When the server is pushed into the rack and
is locked, push the server to the end while
pulling the release levers (blue) on both
sides of the server.
4. Push the server until its lock on front panel
clicks.
(3)
Removal procedure
Remove the server from the rack in the following procedure.
1. Make sure that the server is turned off and then disconnect the power cord or all interface cables from
the server.
2. Remove the front bezel according to
Chapter 2 (1.5 Removing Front Bezel).
146
Important
At least two persons are required to remove the server from rack.
Express5800/R120g-2E User's Guide
2. Installation and Connection
Rail stopper
レールストッパー