Setting Items In Communication Action - Mitsubishi Electric GOT 1000 Series Manual

Graphic operation terminal
Hide thumbs Also See for GOT 1000 Series:
Table of Contents

Advertisement

6.8.1

Setting items in Communication action

Configure the settings for communications with a database.
1.
Performing the operation for adding or modifying an action displays the [Communication action] dialog box.
Make the setting referring to the following descriptions.
Clicking the
For the operation for adding or modifying an action, refer to the following:
6.8 Job Settings - Actions
Action type
Database
Table name
DB-tag link settings
Select/Update conditions
Select sort settings
Exception process setting
Multi select setting
6 - 42
6.8 Job Settings - Actions
button after setting adds or modifies the action.
OK
Item
Select an action type.
Select a database to be accessed.
Set a table name of the database to be accessed.
*1
Set assignments between field values and tag component values (or constant values).
When [Select], [Update] or [MultiSelect] is selected for [Action type], set conditions for the records
*1
to be selected or updated.
When [Select] or [MultiSelect] is selected for [Action type], set a condition for sorting selected
*1
records.
Set the processing to be performed in the following cases:
No corresponding record exists when [Select], [Update], or [MultiSelect] is selected for [Action type].
Multiple corresponding records exist when [Select] or [Update] is selected for [Action type].
button
The number of records to be multi-selected is greater than the number of arrays set in [Array
setting] of the tag when [MultiSelect] is selected for [Action type].
When [MultiSelect] is selected, detailed settings can be configured by clicking this.
button
Description
(To the next page)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents