Sign In
Upload
Manuals
Brands
VOKERA Manuals
Boiler
Vibe 20 A G.C. N 41-094-84
VOKERA Vibe 20 A G.C. N 41-094-84 Manuals
Manuals and User Guides for VOKERA Vibe 20 A G.C. N 41-094-84. We have
1
VOKERA Vibe 20 A G.C. N 41-094-84 manual available for free PDF download: User Instructions
VOKERA Vibe 20 A G.C. N 41-094-84 User Instructions (36 pages)
Brand:
VOKERA
| Category:
Boiler
| Size: 6.31 MB
Table of Contents
Table of Contents
2
Users Instructions
3
Things You Should Know Page
3
Gas Appliances
3
Electrical Supply
3
Guarantee Registration Card
3
Appliance Log Book (UK Only)
3
How Does It Work
3
Dimensions
3
Clearances Required
3
Frost Protection System
3
Pressure Gauge
4
Getting Started Page
5
Before Switching on
5
Appliance Controls
5
Lighting the Boiler
5
Adjusting the Heating Temperature
5
Explanation of Features
5
Automatic Temperature Control
5
How to
5
How to Top-Up the System Pressure
5
How to Reset the Appliance
5
What if
6
What if I Suspect a Gas Leak
6
What if I Have Frequently Top-Up the System
6
What if the Appliance Is Due Its Annual Service
6
What if I Need to Call an Engineer
6
Installation and Servicing Instructions
7
Design Principles & Operating Sequence
8
Principle Components
8
Mode of Operation (at Rest)
8
Mode of Operation (Heating)
8
Safety Devices
8
Technical Data
9
Central Heating
9
Gas Pressures
9
Expansion Vessel
9
Dimensions
9
Clearances
9
Connections
9
Electrical
9
Flue Details (Concentric)
9
A Flue Details (Twin Pipes)
9
Efficiency
9
Pump Duty
10
General Requirements (UK)
11
Related Documents
11
Location of Appliance
11
Gas Supply
11
Flue System
11
Air Supply
11
Water Circulation
11
General Requirements (EIRE)
12
Electrical Supply
12
Mounting on a Combustible Surface
12
Timber Framed Buildings
12
Inhibitors
12
Related Documents
12
Location of Appliance
12
Gas Supply
12
Flue System
12
Air Supply
13
Water Circulation
13
Electrical Supply
13
Mounting on a Combustible Surface
13
Timber Framed Buildings
13
10 Inhibitors
13
11 Declaration of Conformity
13
Delivery
14
Contents
14
Unpacking
14
Preparation for Mounting the Appliance
14
Fitting the Flue
14
Connecting the Gas & Water
18
Electrical Connections
18
Gas Supply Installation
19
The Heating System
19
Initial Filling of the System
19
Initial Flushing of the System
19
Pre-Operation Checks
19
Initial Lighting
19
Checking Gas Pressure & Combustion Analysis
19
Final Flushing of the Heating System
19
Setting the Boiler Operating Temperature
19
Setting the System Design Pressure
19
Regulating the Central Heating System
20
Final Checks
20
Instructing the User
20
General
20
Routine Annual Servicing
20
Replacement of Components
20
Component Removal Procedure
20
Pump Assembly
21
Safety Valve
21
Lower Automatic Air Release Valves
21
Water Pressure Switch
21
Flow Thermistor
21
Return Thermistor
21
Printed Circuit Board
21
Gas Valve
22
Electrodes
22
Flue Fan & Mixer
22
Burner
22
Main Heat Exchanger
23
Automatic By-Pass
23
Expansion Vessel Removal
23
Condense Trap Removal
23
Flue Collector Removal
24
Checking Appliance Operation
24
Appliance Modes of Operation
24
Checking the CO 2 & Adjusting the Valve
25
Combustion Analysis Test
25
Checking the Expansion Vessel
25
External Faults
26
Electrical Checks
26
Fault Finding
26
Component Values & Characteristics
26
External Wiring
27
Typical Control Applications
27
Other Devices
27
Functional Diagram
28
Related Documents
29
Technical Data
29
Converting the Appliance Gas Type
29
Gas Supply
29
Gas Supply Installation
29
Checking the CO 2 and Adjusting the Gas Valve
29
Gas Boiler System Commissioning Checklist
32
Benchmark
32
Service Record
33
Advertisement
Advertisement
Related Products
VOKERA Vibe 25 A G.C. N 41-094-85
VOKERA Neutro
VOKERA Compact 24 SE
VOKERA Compact 25
VOKERA Compact 25 HE
VOKERA Compact 28 SE
VOKERA Compact 29
VOKERA Compact 29 HE
VOKERA Compact 35 HE
VOKERA Compact A 29
VOKERA Categories
Boiler
Water Heater
Thermostat
Heat Pump
Heater
More VOKERA Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL