Sign In
Upload
Manuals
Brands
Sonnen Manuals
Storage
eco 10
User Manuals: Sonnen eco 10 Solar Battery System
Manuals and User Guides for Sonnen eco 10 Solar Battery System. We have
1
Sonnen eco 10 Solar Battery System manual available for free PDF download: Installation And Commissioning Manual
Sonnen eco 10 Installation And Commissioning Manual (65 pages)
Brand:
Sonnen
| Category:
Storage
| Size: 6.33 MB
Table of Contents
Table of Contents
5
About this Manual
9
Target Audience
9
Terminology
9
Symbols Used
9
Safety
10
Intended Use
10
Prohibited Uses
10
General Warnings
10
General Safety Instructions
10
Fire-Related Instructions
11
Fig. 1 Power LED
11
Battery Module Information
12
Specifications
13
Table 1 Specifications
13
Appendix 1. Nameplates and Labels 48
14
Dimensions Storage System Dimensions
14
Appendix 2. Glossary
14
Key Components
14
Fig. 2 Ecolinxx Key Components
14
Appendix 3. Warranty
15
Storage and Transport
15
Storing the System
15
Transporting the System
15
Fig. 3 Allowed Tilt Positions
16
Installation
17
Tools Needed
17
Clearance Requirements
17
Fig. 4 Clearance Requirements
17
Fig. 5 Multiple Unit Clearance Requirements
17
Inspecting the Storage System
18
Mounting the Storage System
18
Fig. 6 Mounting Cleat
18
Fig. 7 Mounting Cleat Location
18
Fig. 8 Positioning the Mounting Bracket
19
Fig. 9 Sliding the Cabinet into the Mounting Cleat
19
Fig. 10 Securing the Mounting Cleat
19
Fig. 11 Unlocking the Door
19
Fig. 12 Removing the Dead Front
19
Fig. 13 Connecting Cabinets (Left Side)
20
Fig. 14 Connecting Cabinets (Right Side)
20
Fig. 15 Removing the Cabinet Cover
20
Fig. 16 Installing Edge Protectors
20
Fig. 17 Flat Band Grounding
21
Fig. 18 Conduit Dimensions
21
Fig. 19 Conduit MAX Exterior Dimensions
21
Fig. 20 Conduit Entry Location (Top View)
21
Table 2 Conduit Entries and Cable Sizes
21
Fig. 21 Removing Battery Cabinet Access Panel Cover
22
Electrical Connections
23
The LFP2 Battery Module
24
Fig. 22 LFP2 Battery Module Main Components
24
The Hub Board
25
Connecting AC Cables
25
Fig. 23 Hub Board
25
Fig. 24 Installation Using Protected Loads Panel
25
Fig. 25 Installation Without Protected Loads Panel
25
Fig. 26 Stripping Cable
26
Fig. 27 Automatic Transfer Switch Actuator
26
Fig. 28 Micro-Grid Connections Location
27
Fig. 29 Micro-Grid Connections
27
Fig. 30 Grid Connections Location
27
Fig. 31 Grid Connections
27
Fig. 32 Grounding Connections Location
28
Fig. 33 Grounding Connections
28
Fig. 34 Generator AC Connections
28
Generator Autostart Wiring (Optional)
29
Fig. 35 Ethernet Socket Location
29
Fig. 36 12V Signal Connection
29
Fig. 37 24V Signal Connection
29
Emergency Stop Switch (Optional)
30
Emergency Stop Wiring (Optional)
30
Fig. 38 Dry Contact Signal Connection
30
Fig. 39 J1 J2 Hub Board Jumper Pins
30
Fig. 40 Emergency Stop Connection
30
Connecting PV Production Meter
31
Fig. 41 Current Transformer Markings
31
Fig. 42 Current Transformers S1 and S2
31
Installing Battery Modules
32
Fig. 43 Battery Terminal Covers
32
Fig. 44 Labeling Battery Modules
32
Fig. 45 Battery Module Placement
32
Fig. 46 Battery Module Configurations
33
Fig. 47 Securing Battery Modules
33
Fig. 48 Place Topside Mounting Bracket
33
Fig. 49 Secure Topside Mounting Bracket
33
Fig. 50 Secure Battery Modules
33
Fig. 51 Inserting Set Screws
34
Fig. 52 2 Battery Bus Bar Arrangement
34
Fig. 53 3 Battery Bus Bar Arrangement
34
Fig. 54 4 Battery Bus Bar Configuration
35
Fig. 55 Terminal Spacer
35
Fig. 56 Installing Power Jumper Cables
36
Fig. 57 Connect Power Homerun Cables
36
Fig. 58 Installing Flange Nuts
37
Fig. 59 Connecting BMS Communication Cables
37
Fig. 60 Link-IN to Link-OUT Daisy-Chain
37
Commissioning Checklist
38
Table 3 Commissioning Prerequisites
38
Fig. 61 Reinstall Access Panel
39
Fig. 62 Re-Install Dead Front Panel
39
Commissioning
40
Turn on the Storage System
40
Fig. 63 Turning on Battery Modules
40
Fig. 64 Pre-Charge Switch and Circuit Breaker
40
Commissioning Assistant
41
Fig. 65 Identifying the Storage System
41
Fig. 66 Logging in to the Storage System
41
Fig. 67 Installing System Updates
41
Fig. 68 Setting Installation Location
41
Fig. 69 Verifying the Date and Time
41
Fig. 70 Entering PV System Information
42
Fig. 71 Generator Autostart Information
42
Fig. 72 Time of Use Information
42
Fig. 73 Configuring Micro-Grid "Wake-Up" Times
43
Fig. 74 Configuring Meters
43
Fig. 75 Inputting Owner Information
44
Fig. 76 Providing Information about Installer
44
Fig. 77 Selecting Operating Mode
44
Digital Interface
46
Internet Portal
46
Establish Connection to the Internet
46
Fig. 78 Login Window
46
Table 4 Required Open Ports for Storage System
46
Fig. 79 Portal Overview Screen
47
Fig. 80 Status View
47
Fig. 81 History View
48
Fig. 82 History View Overlays
48
Fig. 83 History View Week View
48
Fig. 84 Specific Data History
49
Fig. 85 Typical History Graph
49
Fig. 86 Typical History Graph Values
49
Direct Access to the Storage Unit
50
Fig. 87 Storage Unit Configure
50
Fig. 88 Storage Unit Dashboard
50
Fig. 89 Operating Mode Settings
50
Fig. 90 Backup Buffer
51
Fig. 91 Grid Enable Option
51
Fig. 92 Re-Enable Microgrid
51
Fig. 93 System Information
52
Decommissioning
53
Shutting the Storage System down
53
Recycling and Certificates
53
Fig. 94 F1 Circuit Breaker
53
Maintenance and Care
55
Function Control
55
Care of the Storage System
55
Advertisement
Advertisement
Related Products
Sonnen eco 12.5
Sonnen eco 15
Sonnen eco 17.5
Sonnen sonnenBatterie eco 8.0/12
Sonnen eco 5
Sonnen eco 20
Sonnen eco Gen3.1
Sonnen sonnenBatterie eco 8.0/12,5
Sonnen sonnenBatterie eco 8.0/7,5
Sonnen eco 7.5
Sonnen Categories
Storage
Water Dispenser
Camera Accessories
Inverter
Portable Generator
More Sonnen Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL