Sign In
Upload
Manuals
Brands
SolarEdge Manuals
Inverter
SE55K
SolarEdge SE55K Manuals
Manuals and User Guides for SolarEdge SE55K. We have
3
SolarEdge SE55K manuals available for free PDF download: Installation Manual
SolarEdge SE55K Installation Manual (88 pages)
Extended Power Commercial Inverter
Brand:
SolarEdge
| Category:
Inverter
| Size: 4.91 MB
Table of Contents
Disclaimers
2
Important Notice
2
Emission Compliance
2
Support and Contact Information
3
Table of Contents
4
Handling and Safety Instructions
8
Safety Symbols Information
8
Important Inverter Safety Instructions
8
Chapter 1: Introducing the Solaredge Power Harvesting System
10
Solaredge Power Optimizer
10
Extended Power Commercial Inverter
11
Solaredge Monitoring Platform
12
Installation Procedure
12
Installation Equipment List
12
Chapter 2: Installing the Power Optimizers
14
Safety
14
Installation Guidelines
14
Step 1: Mounting the Power Optimizers
15
Step 2: Connecting a PV Module to a Power Optimizer
16
Step 3: Connecting Power Optimizers in Strings
16
Step 4: Verifying Proper Power Optimizer Connection
18
Chapter 3: Installing the Primary and Secondary Unit(S)
19
Primary Unit Package Contents
19
Secondary Unit Package Contents
19
Identifying the Units
19
Primary Unit Interface
19
Connection Unit Interface
22
Secondary Unit Interface
23
Mounting and Connecting the Primary and Secondary Unit(S)
24
Chapter 4: Connecting the AC and Strings to the Connection Unit
29
Grid Connection Guidelines
29
Connecting the AC Grid to the Connection Unit
29
Connecting the AC Grid and Grounding to the Connection Unit
30
Grounding
30
Secondary Grounding
31
Connecting the Strings to the Connection Unit
32
Selecting a Residual Current Device (RCD)
34
Chapter 5: Activating, Commissioning and Configuring the System Using Solaredge Inverter Setapp
35
Step 1: Activating the Installation
35
Step 2: Commissioning and Configuring the Installation
36
Setting Country and Language
37
Pairing
37
Communication
39
Power Control
41
Maintenance
42
Information
44
Step 3: Verifying Proper Activation and Commissioning
45
Reporting and Monitoring Installation Data
45
The Solaredge Monitoring System
45
Providing Installation Information
46
Site Mapper Application
46
Creating a Site in the Solaredge Monitoring Platform
47
Paper Template
47
Viewing System Status
47
Main Inverter Status
48
Multiple Inverters Status
49
Communication Status
50
Inverter Energy Status
51
Meter Status
51
Chapter 6: Setting up Communication
53
Communication Options
54
Ethernet
54
Rs485
54
Wi-Fi
54
Gsm
54
Communication Connectors
55
Communication Board
56
Primary Unit Communication Board
56
Connection Unit Communication Board
57
Removing the Connection Unit Cover
57
Creating an Ethernet (LAN) Connection
57
Creating an RS485 Bus Connection
62
RS485 Bus Configuration
65
Verifying the Connection
66
Appendix A: Errors and Troubleshooting
68
Identifying Errors
68
Power Optimizer Troubleshooting
71
Troubleshooting Communication
72
Troubleshooting Ethernet (LAN) Communication
72
Troubleshooting RS485 Communication
72
Additional Troubleshooting
72
Appendix B: Mechanical Specifications
74
Primary Unit and Connection Unit
74
Secondary Unit
74
Appendix C: Safedc
75
Appendix D: External Fan Maintenance and Replacement
76
Fan Maintenance
76
External Fan Replacement
76
Appendix E: Replacing System Components
78
Replacing the Primary Unit
78
Replacing a Secondary Unit
79
Replacing the Connection Unit
79
Removing the Connection Unit
79
Installing a New Connection Unit
80
Connecting the Connection Unit to the Primary Unit
80
Replacing Power Optimizers
81
Technical Specifications
83
Advertisement
SolarEdge SE55K Installation Manual (103 pages)
Three Phase Inverter with Synergy Technology
Brand:
SolarEdge
| Category:
Inverter
| Size: 5.45 MB
Table of Contents
Disclaimers
2
Important Notice
2
Emission Compliance
3
Table of Contents
4
Contents
4
Support and Contact Information
6
Version History
7
Handling and Safety Instructions
8
Safety Symbols Information
8
Important Inverter Safety Instructions
9
Chapter 1: Introducing the Solaredge Power Harvesting System
11
Power Optimiser
11
Three Phase Inverter with Synergy Technology
12
Monitoring Platform
13
Installation Procedure
13
Installation Equipment List
13
Chapter 2: Installing the Power Optimizers
15
Safety
15
Installation Guidelines
16
Step 1: Mounting the Power Optimizers
18
Step 2: Connecting a PV Module to a Power Optimiser
18
Step 3: Connecting Power Optimisers in Strings
19
Step 4: Verifying Proper Power Optimiser Connection
20
Chapter 3: Installing the Primary and Secondary Unit(S)
22
Primary Unit Package Contents
22
Secondary Unit Package Contents
22
Identifying the Units
22
Primary Unit Interface
23
Connection Unit Interface
27
Secondary Unit Interface
29
Mounting and Connecting the Primary and Secondary Unit(S)
29
Chapter 4: Connecting the AC and Strings to the Connection Unit
37
Grid Connection Guidelines
37
Connecting the AC Grid to the Connection Unit
38
Connecting the AC Grid and Grounding to the Connection Unit
39
Connecting the Strings to the Connection Unit
41
Selecting a Residual Current Device (RCD)
43
Chapter 5: Activating, Commissioning and Configuring the System Using the Inverter Setapp
44
Step 1: Activating the Installation
44
Step 2: Commissioning and Configuring the Installation
45
Power Control
47
Step 3: Verifying Proper Activation and Commissioning
50
Viewing System Status
50
Main Inverter Status
51
Reporting and Monitoring Installation Data
59
Chapter 6: Setting up Communication
62
Communication Options
63
Communication Connectors
64
Creating an Ethernet (LAN) Connection
67
Creating an RS485 Bus Connection
71
RS485 Bus Configuration
74
Verifying the Connection
74
Appendix A: Errors and Troubleshooting
77
Identifying Errors
77
Power Optimizer Troubleshooting
79
Troubleshooting Communication
81
Appendix B: Mechanical Specifications
83
Primary Unit and Connection Unit
83
Secondary Unit
83
Appendix C: Safedc
84
Appendix D: External Fan Maintenance and Replacement
85
Fan Maintenance
85
External Fan Replacement
85
Appendix E: Replacing System Components
88
Replacing the Primary Unit
88
Replacing a Secondary Unit
90
Replacing the Connection Unit
90
Replacing Power Optimisers
92
Appendix F: Determining the Circuit Breaker Size
93
Revision History
93
Introduction
93
Using Transformers in Commercial Three Phase Inverter Installations
93
Determining the Size of an Inverter Circuit Breaker
95
Three Phase Inverter with Synergy Technology - Technical Specifications (Europe and APAC)
97
SolarEdge SE55K Installation Manual (74 pages)
Three Phase Inverters with Synergy Technology
Brand:
SolarEdge
| Category:
Inverter
| Size: 7.94 MB
Table of Contents
Disclaimers
2
Important Notice
2
Emission Compliance
3
Safety Warnings
3
Table of Contents
5
Handling and Safety Instructions
7
Safety Symbols Information
7
Chapter 1: Introducing the Solaredge Power Harvesting System
10
Power Optimiser
10
Three Phase Inverter with Synergy Technology
11
Monitoring Platform
12
Designer
12
Installation Tools and Material List
12
Installation Procedure
13
Chapter 2: Installing the Power Optimisers
14
Safety
14
Installation Guidelines
15
Step 1: Mounting the Power Optimisers
18
Step 2: Connecting a PV Module to a Power Optimiser
18
Step 3: Connecting Power Optimisers in PV Strings
19
Step 4: Verifying Proper Power Optimiser Connection
20
Chapter 3: Installing the Synergy Manager and Synergy Units
22
Synergy Manager Package Contents
22
Synergy Unit Package Contents
22
Identifying the Units
22
Front Interface of Synergy Manager
23
Inverter Interconnection Cable Interfaces
27
Synergy Manager External Cable Interface
28
Synergy Unit Interface Connectors
28
Drilling Conduit Holes
30
Mounting and Connecting the Synergy Manager and Synergy Units
31
Chapter 4: Connecting AC and PV Arrays to the Synergy Manager
36
Connecting the AC Grid to the Synergy Manager
36
Connecting the PV Arrays to the Synergy Manager
36
Connecting Ground and AC Wires to the Synergy Manager
38
Chapter 5: Activating, Commissioning and Configuring the System
44
On-Grid Commissioning of the Inverter
45
Step 1: Activating the Installation
45
Step 2: Commissioning and Configuring the Installation
45
Step 3: Verifying Proper Activation and Commissioning
47
Pre-Commissioning (Off-Grid)
47
Reporting and Monitoring Installation Data
49
Chapter 6: Setting up Communication with the Monitoring Platform
51
Communication Options
51
Communication Connectors
52
Creating an Local Area Network (LAN) Connection
55
Creating an RS485 Bus Connection
60
RS485 Bus Configuration
63
Verifying the Connection
64
Signaling Options
64
Appendix A: Errors and Troubleshooting
66
Identifying Errors
66
Power Optimiser Troubleshooting
67
Troubleshooting Communication
69
Appendix B: Adding Optional Components
71
AC Surge Protection Device (SPD)
71
DC Surge Protection Device (SPD)
71
Wi-Fi Antenna
71
Cellular Plug-In
72
Appendix C: Mechanical Specifications
73
Advertisement
Advertisement
Related Products
SolarEdge Delta SE55.5K
SolarEdge SE5000US
SolarEdge SE5000H-US
SolarEdge SE50K
SolarEdge StorEdge SE5K
SolarEdge StorEdge SE5000-xxS0 series
SolarEdge SE5000H
SolarEdge SE5000H-AU
Solar Edge SE5k
SolarEdge StorEdge SE5000H-RWS00BNO4
SolarEdge Categories
Inverter
Measuring Instruments
Recording Equipment
Control Unit
Battery Charger
More SolarEdge Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL