Sign In
Upload
Manuals
Brands
Hitachi Manuals
Storage
3090 G1
Hitachi 3090 G1 Manuals
Manuals and User Guides for Hitachi 3090 G1. We have
1
Hitachi 3090 G1 manual available for free PDF download: Hardware Reference Manual
Hitachi 3090 G1 Hardware Reference Manual (138 pages)
NAS Platform
Brand:
Hitachi
| Category:
Storage
| Size: 5.28 MB
Table of Contents
Table of Contents
3
Preface
7
Related Documentation
7
Accessing Product Documentation
10
Getting Help
10
Comments
10
About this Manual
13
Audience
14
Conventions
14
Safety Information
19
Electrostatic Discharge Precautions
20
Safety and Handling Precautions
20
Electrical Precautions
21
Data Protection Precautions
21
Mandatory Regulations
23
International Standards
24
Federal Communications Commission (FCC)
24
European Union (EU) Statement
25
Canadian Department of Communication Compliance Statement
25
Avis de Conformité Aux Normes du Ministère des Communications du Canada
26
Radio Protection for Germany
26
Food and Drug Administration (FDA)
26
Chinese Rohs Compliance Statement
26
System Overview
29
System Components
30
Server Specifications
31
Attaching a Rack Stabilizer Plate
32
Hitachi NAS Platform Server Components
33
Introducing the Hitachi NAS Platform
34
Ventilation
34
Front View of Server
34
NVRAM Backup Battery Pack
36
Server Rear Panel
37
Rear Panel Server LED and Button Locations
39
Rear Panel LED State Descriptions
39
Power Button (PWR)
40
Reset Button (RST)
41
10 Gbe Ports
41
10 Gigabit Ethernet Cluster Interconnect Ports
41
10 Gigabit Ethernet Customer Data Network Ports
42
GE Ethernet Network Ports
43
10/100 Private Ethernet Ports
43
Fibre Channel Storage Ports
44
Serial Port
45
Power Supply Units
45
10/100/1000 Ethernet Management Ports
47
USB Ports
47
Management Interfaces
48
RS-232 Serial Management Port
48
Replacing Server Components
49
Removing and Replacing the Front Bezel
50
Bezel Removal
50
Replacing a Fan
50
Replacing the NVRAM Backup Battery Pack
52
Removing the Battery Pack from the Caddy
52
Removing the Battery Pack: Type 1 Chassis
54
Inserting the New Battery Pack: Type 1 Chassis
55
Removing the Battery Pack: Type 2 Chassis
57
Inserting the New Battery Pack: Type 2 Chassis
60
Collecting System Backups and Diagnostics
62
Resetting the Battery Age and Restarting the Chassis Monitor
63
Collecting a Final Diagnostic
64
Replacing a Hard Disk
65
Replacing a Power Supply Unit
67
Rebooting, Shutting Down, and Powering off
69
Rebooting or Shutting down a Server
70
Rebooting or Shutting down a Cluster
71
Restarting an Unresponsive Server
72
Powering down the Server for Maintenance
73
Powering down the Server for Shipment or Storage
74
Recovering from Power Standby
75
Hard Disk Replacement
77
Intended Audience
79
Downtime Considerations for Hard Disk Replacement
79
Requirements for Hard Disk Replacement
80
Overview of the Procedure
80
Accessing Linux on the Server and Node
81
Using the Serial (Console) Port
81
Using SSH for an Internal SMU
82
Using SSH for an External SMU
82
Step1: Performing an Internal Drive Health Check
83
Step 2: Gathering Information about the Server or Node
88
Step 3: Backing up the Server Configuration
90
Step 4: Locating the Server
90
Step 5: Save the Preferred Mapping and Migrate Evss (Cluster Node Only)
91
Step 6: Replacing a Server's Internal Hard Disk
93
Step 7: Synchronizing Server's New Disk
100
Step 8: Replacing the Server's Second Disk
101
Step 9: Synchronizing the Second New Disk
101
Step 10: Restore Evss (Cluster Node Only)
101
Server Replacement Procedures
105
Replacement Procedure Overview
106
Requirements
106
Swapping Components
106
Model Selection
107
MAC ID and License Keys
107
Previous Backups
107
Upgrades
108
Manually Installing an Internal SMU (if Necessary)
108
Replacing a Single Server with an Embedded SMU
108
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
109
Shutting down the Server You Are Replacing
111
Configuring the Replacement Server
111
Finalizing and Verifying the Replacement Server Configuration
113
Replacing a Single Server with an External SMU
115
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
115
Shutting down the Server You Are Replacing
116
Configuring the Replacement Server
117
Finalizing and Verifying the Replacement Server Configuration
119
Replacing a Node Within a Cluster
121
Capturing Information from the Existing Node
121
Preparing the New Node
122
Preparing the Old Node for Removal
122
Installing the New Node
123
Finalizing and Verifying the Server Configuration
123
Replacing All Servers Within a Cluster
126
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
127
Shutting down the Servers You Are Replacing
128
Configuring the Replacement Servers
129
Finalizing and Verifying the System Configuration
131
B Parts List for 3080/3090 G1 Servers
133
Advertisement
Advertisement
Related Products
Hitachi 3080 G1
Hitachi 3090 G2
Hitachi 3090
Hitachi airHome 300 RAK-CJ24PCASM
Hitachi airHome 300 RAC-CJ18PCASM
Hitachi airHome 300 RAC-QH10PCASM
Hitachi airHome 300 RAR-M0A6
Hitachi air Home 300 RAK-CH18PCAST
Hitachi air Home 300 RAC-CH24PCAST
Hitachi airHome 300 RAC-QH13PCASM
Hitachi Categories
Projector
Air Conditioner
Drill
Power Tool
TV
More Hitachi Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL