Sign In
Upload
Manuals
Brands
Euronda Manuals
Laboratory Equipment
E9 MED
Euronda E9 MED Manuals
Manuals and User Guides for Euronda E9 MED. We have
1
Euronda E9 MED manual available for free PDF download: Service Manual
Euronda E9 MED Service Manual (168 pages)
Steam Sterilizer
Brand:
Euronda
| Category:
Laboratory Equipment
| Size: 11.03 MB
Table of Contents
Table of Contents
3
1 Introduction
7
General Precautions
7
Reading the Manual: Symbols and Conventions
7
How to Obtain a New Copy of the Manual
8
2 Safety
9
General Safety Warnings
9
Safety Devices
10
Residue Risks
11
Safety Signs on the Unit
12
3 Technical Data
13
Overall Space Required
13
Technical Data and Noise
14
Quality of Water
15
Serial Numbers Coding
16
4 Installation
17
Positioning the Unit
17
Installing the Unit
18
Installation and Adjustement
18
Operator Registration
23
Performing the Vacuum Test
24
Performing the B134 Cycle
25
Labels Printing (Only E9 Recorder)
26
Delivery of Technical Documentation
28
5 Description of Cycle and Main Performance Data
29
E9 Inspection Components
29
Cycle for E9 Inspection with Separator Draining Pump
31
Phase 0: Turning on the Sterilizer
32
Start-Vacuum Phase V1/I
33
Vacuum Phase V1/II
34
Vacuum Phase V1/III
35
Water Inlet Phase
36
Water Outgas System Drain Phase
37
Pressure Increase Phase P
38
Water Transfer Phase
39
Vacuum - Thermodynamic Vacuum Phase V
40
Vacuum 2,3,4 Phase V2
41
Pressure Increase/Sterilization Phase P
42
Sterilization Phase
43
Steam Discharge Phase
44
Steam Discharge Phase I
45
Pressure Levelling Phase I
46
Vacuum Phase II
47
Pressure Levelling Phase II
48
End of Cycle Phase
49
CYCLE for E9 INSPECTION/RECORDER with CIRCUIT U-234 (Since Firmware 7.01)
50
Turning on the Sterilizer
50
Phase 1: Start, Water Outgas System Emptying and Steam Generator Filling (U-234 Circuit)
51
Phase 2: Steam Generator Emptying (U-234 Circuit)
52
Phase 3: Water Outgas System Filling (U-234 Circuit)
53
Phase 4: Vacuum into Chamber and Water Outgas System (U-234 Circuit)
54
Phase 5: Water Separator Emptying and Steam Generator Filling (U-234 Circuit)
55
Phase 6: Pressure Rise (U-234 Circuit)
56
Phase 7: Emptying and Vacuum (U-234 Circuit)
57
Pressure Rise (U-234 Circuit)
58
CYCLE for E9 MED (up to EGO090100 18 L and up to EGP090080 24 L)
59
Turning on the Sterilizer
59
Phase 1: Vacuum into Chamber
60
Phase 2: Steam Generator Filling
61
Phase 3: Pressure Rise
62
Phase 4: Water Separator Emptying and Vacuum
63
Third Pressure Rise and Sterilisation
64
Drying Phase
65
CYCLE for E9 MED (Since EGO090101 18 L and Since EGP090081 24 L)
66
Phase 0: Turning on the Sterilizer
66
Phase 1: Start and Chamber Emptying
67
Phase 2: Water Injection into the Chamber
68
Phase 3: Pressure Rise
69
Phase 4: Pressure Discharge and Emptying
70
Phase 5: Pressure Rise and Separator Emptying
71
Phase 6: Pressure Balancing
72
Examples of Sterilization Cycle Reports
73
6 Description of Test and Main Performance Data
74
Graph of Complete Vacuum Test
74
Phase 0: Starting
75
Vacuum Phase
76
Pressure Levelling/Maintenance Phase
77
Pressure Levelling Phase
78
Bowie&Dick Test
79
Helix Test
79
7 Maintenance
81
Safety Warnings
81
Periodic Maintenance
83
Extraordinary Maintenance
84
Technical Menu
86
Components List E9 Inspection (U-234 / Recorder Circuit)
94
8 Components and Diagrams
96
Wiring Diagram
96
Hydraulic Diagram
98
Hydraulic Diagram E9
98
Hydraulic Diagram E9 U-234
99
Hydraulic Diagram E9 MED (Since EGO090101 18 L and Since EGP090081 24 L)
99
9 Spare Parts Catalogue
100
Exploded General Diagram of E9 Inspection
100
Index of Tables
101
Tab. 01: Safety Housing Assembly E9
102
Tab. 02: Door Assembly E9 Inspection / Recorder
103
Tab. 02: Door Assembly E9 Med
104
Tab. 03: Control Panel Assembly E9 Inspection
105
Tab. 03: Control Panel Assembly E9 Recorder
106
Tab. 03: Control Panel Assembly E9 Med
107
Tab. 04: Tank and Power Card + Pressure Transducer Assembly E9
108
Med
110
Tab. 05: Vacuum Pump and Radiator Assembly E9
112
Tab. 05: Vacuum Pump and Radiator Assembly E9 U-234 / Recorder / Med
113
Tab. 06: Tank Support and Nme Micropump Assembly
114
Tab. 06: Tank Support and Sicce Micropump Assembly
115
Tab. 06: Tank Support and Micropump Assembly E9 U-234 / Recorder / Med
116
Recorder
117
Tab. 07: Chassis, Water Outgas System and Crosspiece Assembly E9 Inspection Recorder
117
Tab. 07: Chassis and Crosspiece Assembly E9 Med
119
Tab. 08: Solenoid Valve Assembly E9
121
Tab. 08: Solenoid Valve Assembly E9 U-234 / Recorder
123
Tab. 08: Solenoid Valve Assembly E9 Med
125
Tab. 09: Boiler/Electromagnet Assembly E9 Inspection / Recorder
127
Tab. 09: Boiler/Electromagnet Assembly E9 Med
129
Tab. 10: Front Panel Assembly E9
131
Tab. Kit: Accessories Kit E9
132
10 Product Versions
133
Registrations of Modifications to E9 Hardware
133
11 Troubleshooting
134
Summary of Alarm Signals
134
Repair Briefs
140
Index of Repair Briefs
140
Required Maintenance Tools
162
12 Demolition
165
Demolition Instructions
165
Resale
165
Appendix
166
Advertisement
Advertisement
Related Products
Euronda E9 INSPECTION
Euronda Pro System E6
Euronda E9 Next Series
Euronda Euroseal
Euronda E9 Inspection Med
Euronda Euroseal Infinity
Euronda Pro System E8
Euronda Categories
Steriliser
Laboratory Equipment
Indoor Furnishing
Food Saver
Kitchen Appliances
More Euronda Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL