Sign In
Upload
Manuals
Brands
ABB Manuals
Protection Device
REQ650 1.3 IEC
ABB REQ650 1.3 IEC Manuals
Manuals and User Guides for ABB REQ650 1.3 IEC. We have
1
ABB REQ650 1.3 IEC manual available for free PDF download: Commissioning Manual
ABB REQ650 1.3 IEC Commissioning Manual (124 pages)
Brand:
ABB
| Category:
Protection Device
| Size: 3.3 MB
Table of Contents
Table of Contents
7
Introduction
13
This Manual
13
Intended Audience
13
Product Documentation
14
Product Documentation Set
14
Document Revision History
15
Related Documents
15
Symbols and Conventions
16
Symbols
16
Document Conventions
16
Safety Information
17
Symbols on the Product
17
Warnings
17
Caution Signs
18
Note Signs
19
Available Functions
21
Back-Up Protection Functions
21
Control and Monitoring Functions
22
Station Communication
25
Basic IED Functions
27
Starting up
29
Factory and Site Acceptance Testing
29
Commissioning Checklist
29
Checking the Power Supply
30
Energizing the IED
30
Checking the IED Operation
30
IED Start-Up Sequence
30
Setting up Communication between PCM600 and the IED
31
Writing an Application Configuration to the IED
36
Checking CT Circuits
37
Checking VT Circuits
37
Using the RTXP Test Switch
38
Checking Binary Input and Output Circuits
38
Binary Input Circuits
38
Binary Output Circuits
39
Checking Optical Connections
39
Establishing Connection and Verifying the IEC 61850 Station Communication
41
Setting the Station Communication
41
Verifying the Station Communication
41
Testing IED Operation
43
Preparing the IED to Verify Settings
43
Activating the Test Mode
44
Preparing the Connection to the Test Equipment
45
Connecting the Test Equipment to the IED
45
Releasing the Function to be Tested
46
Verifying Analog Primary and Secondary Measurement
47
Testing the Protection Functionality
48
Testing Functionality
49
Testing Disturbance Report
49
Introduction
49
Disturbance Report Settings
49
Identifying the Function to Test in the Technical Reference Manual
49
Testing Current Protection Functions
49
Instantaneous Phase Overcurrent Protection 3-Phase Output PHPIOC
49
Measuring the Operate Limit of Set Values
50
Completing the Test
50
Instantaneous Phase Overcurrent Protection Phase Segregated Output SPTPIOC
50
Four Step Phase Overcurrent Protection 3-Phase Output OC4PTOC
51
Verifying the Settings
51
Completing the Test
52
Four Step Phase Overcurrent Protection Phase Segregated Output OC4SPTOC
52
Verifying the Settings
52
Completing the Test
53
Instantaneous Residual Overcurrent Protection EFPIOC
53
Measuring the Operate Limit of Set Values
53
Four Step Residual Overcurrent Protection, Zero or Negative Sequence Direction EF4PTOC
53
Four Step Directional Residual Overcurrent Protection
54
Four Step Non-Directional Residual Overcurrent Protection
54
Completing the Test
54
Sensitive Directional Residual Overcurrent and Power Protection SDEPSDE
55
Measuring the Operate and Time Limit for Set Values
55
Completing the Test
59
Thermal Overload Protection, One Time Constant, Celsius/Fahrenheit LCPTTR/LFPTTR
59
Testing the Protection Without External Temperature Compensation (Noncomp)
59
Completing the Test
60
Breaker Failure Protection, Phase Segregated Activation and Output CCRBRF
60
Checking the Phase Current Operate Value, IP
60
Checking the Residual (Earth Fault) Current Operate Value IN> Set below IP
61
Checking the Re-Trip and Back-Up Times
61
Verifying the Re-Trip Mode
61
Verifying the Back-Up Trip Mode
62
Verifying the Case Retripmode = Contact
62
Verifying the Function Mode Current&Contact
63
Completing the Test
63
Breaker Failure Protection, Phase Segregated Activation and Output CSPRBRF
63
Checking the Phase Current Operate Value, IP
64
Checking the Residual (EF) Current Operate Value IN> Set below IP
64
Checking the Re-Trip and Back-Up Times
64
Verifying the Retripmode
65
Verifying the Case Retripmode = no CB Pos Check
65
Verifying the Function Mode Current&Contact
65
Checking the Case with Fault Current below Set Value I>Blkcont
66
Checking the Phase Current Operate Value, IP
66
Completing the Test
66
Stub Protection STBPTOC
67
Measuring the Operate Limit of Set Values
67
Completing the Test
67
Pole Discordance Protection CCRPLD
67
Verifying the Settings
68
Completing the Test
68
Broken Conductor Check BRCPTOC
68
Measuring the Operate and Time Limit of Set Values
68
Completing the Test
69
Directional Underpower Protection GUPPDUP
69
Verifying the Settings
69
Completing the Test
70
Directional Overpower Protection GOPPDOP
70
Verifying the Settings
71
Completing the Test
71
Testing Voltage Protection Functions
71
Two Step Undervoltage Protection UV2PTUV
71
Verifying the Setting
71
Completing the Test
73
Two Step Overvoltage Protection OV2PTOV
73
Verification of Single-Phase Voltage and Time Delay to Operate for Step 1
73
Completing the Test
74
Two Step Residual Overvoltage Protection ROV2PTOV
74
Verifying the Settings
74
Completing the Test
75
Loss of Voltage Check LOVPTUV
75
Measuring the Operate Limit of Set Values
75
Completing the Test
76
Testing Frequency Protection Functions
76
Underfrequency Protection SAPTUF
76
Verifying the Settings
76
Completing the Test
77
Overfrequency Protection SAPTOF
77
Verifying the Settings
78
Completing the Test
79
Rate-Of-Change Frequency Protection SAPFRC
79
Verifying the Settings
79
Testing Secondary System Supervision Functions
80
Current Circuit Supervision CCSRDIF
80
Verifying the Settings
80
Completing the Test
80
Fuse Failure Supervision SDDRFUF
80
Checking that the Binary Inputs and Outputs Operate as Expected
80
Measuring the Operate Value for the Negative Sequence Function
81
Measuring the Operate Value for the Zero-Sequence Function
82
Checking the Operation of the Du/Dt and DI/Dt Based Function
82
Completing the Test
83
Testing Control Functions
83
Synchrocheck, Energizing Check, and Synchronizing SESRSYN
83
Testing the Synchronizing Function
85
Testing the Synchrocheck Check
86
Testing the Energizing Check
89
Testing the Voltage Selection
90
Completing the Test
90
Autorecloser for 3-Phase Operation SMBRREC
90
Preparation of the Verification
92
Switching the Autorecloser for 3-Phase Operation Function to on and off
92
Verifying the Autorecloser for 3-Phase Operation Function SMBRREC
93
Checking the Reclosing Conditions
93
Completing the Test
94
Autorecloser for 1/3-Phase Operation STBRREC
94
Preparation of the Verification
96
Switching the Auto-Reclosing Function on and off
96
Verifying the Auto-Reclosing Function
97
Checking the Reclosing Conditions
97
Checking the Influence of the INHIBIT Signal
97
Check Closing Onto a Fault
97
Checking the Influence of CB Not Ready for Reclosing
98
Checking the Influence of Synchrocheck (at Three-Phase Reclosing)
98
Restoring Equipment
98
Completing the Test
98
Interlocking
98
Testing Scheme Communication Functions
99
Testing Logic Functions
99
Tripping Logic, Common 3-Phase Output SMPPTRC
99
Three-Phase Operating Mode
99
Circuit Breaker Lockout
99
Completing the Test
100
Tripping Logic Phase Segregated Output SPTPTRC
100
1Ph/3Ph Operating Mode
100
Circuit Breaker Lockout
101
Completing the Test
101
Testing Monitoring Functions
101
Event Counter CNTGGIO
101
Limit Counter L4UFCNT
102
Completing the Test
102
Testing Metering Functions
102
Pulse Counter PCGGIO
102
Testing Station Communication
102
Establishing Connection and Verifying the IEC 61850 Communication
102
Overview
102
Setting the Station Communication
103
Verifying the Station Communication
103
Exit Test Mode
104
Commissioning and Maintenance of the Fault Clearing System
105
Commissioning Tests
105
Periodic Maintenance Tests
105
Visual Inspection
106
Maintenance Tests
106
Troubleshooting
109
Fault Tracing
109
Identifying Hardware Errors
109
Identifying Runtime Errors
109
Identifying Communication Errors
109
Checking the Communication Link Operation
109
Checking the Time Synchronization
110
Running the Display Test
110
Indication Messages
110
Internal Faults
110
Warnings
111
Additional Indications
111
Correction Procedures
112
Changing and Setting the Password
112
Identifying IED Application Problems
112
Inspecting the Wiring
112
Glossary
117
Advertisement
Advertisement
Related Products
ABB Relion REQ650
ABB REJ601
ABB RELION RET670
ABB RELION REB670
ABB REF611
ABB RET670 ANSI
ABB RELION REM615
ABB REG670 A20
ABB REG670 B30
ABB REL 352
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL