ACAPELLA
joule acapella solar tubes installation manual
ACAPELLA
1
installation manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ACAPELLA and is the answer not in the manual?

Questions and answers

Summary of Contents for joule ACAPELLA

  • Page 1 ACAPELLA joule acapella solar tubes installation manual ACAPELLA installation manual...
  • Page 3: Table Of Contents

    Flat Roof Mounting Frame Collecting Flow and Return Pipework Stainless Steel Solar Pipe Pump Station Safety Vessel Connection Electrical Solar Controller Standard Solar System East/West Solar System Dual Store Solar System Commissioning Servicing and Maintenance ACAPELLA ACAPELLA installation manual installation manual...
  • Page 4: Introduction

    This guide will illustrate and explain how a system should be installed to conform to the Joule manufacturer guidelines for the Acapella product models. Us- ing this guide Stages of a solar installation are described in the following pages, with illustrations where necessary to explain how to install the relevant components, and contains general recommendations and important safety information.
  • Page 5: Site Survey

    What type of plumbing system is in the dwelling (vented or un-vented)? Is solid fuel incorporated into the plumbing system? Is there adequate access to route pipe work from solar collectors down to cylinder location? (yes/no) Is there space in the hot press to locate solar pump station? (yes/no) ACAPELLA ACAPELLA installation manual installation manual...
  • Page 6: Risk Assessment

    Risk Assesment Safe Roof Access To Work Is there adequate access to area of house to mount scaffolding or ladders? (yes/no) Is there steady and secure base on which to mount scaffolding or ladders? (yes/no) Are the scaffolding and or ladders fit for use intended? (yes/no) All installers trained in working at heights? (yes/no) Are all harness and other safety equipment working correctly? (yes/no) All work carried out should be in accordance with all relevant good pratices and or current building stand- ards. All current regulations should be followed in relation to working at heights. Nothing stated in this guide takes pre- sedence over current standards. Condition of Roof What are the centres of roof rafters where solar collector is to be mounted (eg 400mm)? (mm) What is the size of roof rafters (eg 6x2”, 7x2”, 8x2”)? (inch) Are roof rafters cross braced? (yes/no) Is any of the timber showing discolouration (indicating rot)? (yes/no) To determine the total load on the roof you must get the total weight of the collectors and divide this weight by the number of roof fixing bolts or anchors used to hold the collector on the roof. This will give you the weight of the solar panels on each point of the roof.
  • Page 7 Legionella / Bacterial Growth Ensure that there is no dead legs in the existing plumbing system that could induce the growth of legionella. (confirm) Ensure that the stats controlling the boiler and the stat controlling the immersion are set to 60 °C or above. (confirm) Ensure that the client understands the risk of legionella and the standard procedures for reducing the risk (confirm) of it forming. Also ensure that the client understands that you are their to install a solar thermal system and that you do not take any responsibility for auditing their hot water system for risk of legionnella forming. That you will endeavour to minimise the risk of it forming by the work that you carry out but any existing risk should be dealt with a certified professional. ACAPELLA ACAPELLA installation manual installation manual...
  • Page 8: Kit Components

    Kit Components Standard Kit Components Solar Pump Solar Controller Solar Expansion Vessel Solar Tubes & Profiles Solar Fluid Mounting Options Bolt Mounting Option Tile Bracket Option Slate Bracket Option Roof Flashing Options Lead Roof Flashing Aluminium Roof Flashing 4” Rubber Gasket Set...
  • Page 9: Mounting Options

    Mounting Options Piping Options DN16 Duo Pipe DN20 Pipe Stainless Tails & Copper Optional Accessories Installation Hose Mounting Set Over Voltage Lightning 3/4” Thermostatic Mixing Valve Cooling Vessel Discharge Vessel ACAPELLA ACAPELLA installation manual installation manual...
  • Page 10: Important Pre Installation Information

    Important Pre Installation Information Sizing of safety equipment Component sizes are relative to the volume of liquid in the system. Pipe sizing (minimum of 15 mm diameter pipework must be used) Collector Flow Rate Pipe Diameter Acapella 20 Tube Acapella 30 Tube Acapella 40 Tube Area (m ltr/hr Copper External (mbar) (mbar) (mbar) (mm) 8.54 1.18 4.11 12.57 2.87 10.74 17.08 2.36 8.22 21.11 4.05 14.58 25.14 5.74 20.94 33.68...
  • Page 11: Roof Mounting Options

    Roof Mounting options The Acapella product range is available with a choice of roof fixing options to suit many roof types, see diagram below for the most common fixings. The most common fixings are illustrated and explained in the following section and may be easily secured to slate, tile or masonry finishes. Option Code Describtion RF-PA-MT-BO-X Sloped roof bolt kit option RF-PA-MT-SL-X Sloped roof slate mounting bracket option RF-PA-MT-TI-X Sloped roof tile mounting bracket option SOL-FRF-X-25 25Deg increase roof inclined bracket SOL-FRF-X-45 45Deg flat roof inclined roof bracket X= 2, 3, 4, 5, 6 Metal Roof Fixings Joule also supplies roof fixing kits for metal and other commercial roofs. Two options available utilise appropriate clamps so the fabric of the metal roof is not penetrated - see page xx. Note the minimum and maximum distances on each fixing kit.
  • Page 12: Collector Assembly

    Collector Assembly...
  • Page 13: Inserting Tubes

    2. By applying force to the metal heat pipe guide the bulb into the manifold in the next available socket. 3. To ensure the bulb has been inserted fully, twist the metal heat pipe to remove any friction. 4. Once you are sure that the metal heat pipe and bulb are inserted correctly slide the glass tube up towards the manifold. 5. To ease the glass tube sealing inside the manifold socket rub lubricant around the rim of the glass. Water will suffice if lubricant is not available. ACAPELLA ACAPELLA installation manual installation manual...
  • Page 14: Sloped Roof Bolt Mounting Kit

    Sloped Roof Bolt Mounting Kit Mounting parallel bench srew mountingsystem General Note: Points 9-12, 17 and 18 of these instructions only apply when mounting more than two collectors! A = 1540 mm ±10 mm Measure the mounting points (for a suggestion see previous side) Drill tiles - Ø...
  • Page 15: Sloped Roof Tile Mounting Bracket

    The top piece can adjust to increase or decrease the height of the collector above the roof tile. The bracket is connected to the pro- file using nuts, bolts and washers. The bolt head slides through the profile to the desired location and then the bracket is fixed using the nut and washer. ACAPELLA ACAPELLA ACAPELLA installation manual installation manual installation manual...
  • Page 16: Sloped Roof Slate Mounting Bracket

    Sloped Roof Slate Mounting Bracket Slate roof brackets are an ideal bracket for fixing the solar collectors to thin flat slates. The bracket is connected to the profile using nuts, bolts and washers. The bolt head slides through the profile to the desired location and then the bracket is fixed using the nut and washer.
  • Page 17: Flat Roof Mounting Frame

    The frame consists of triangle nunber A frame pieces with two back and sloped bars. Each A frame connects to the collec- tor profiles using nuts, bolts and washers. The frame is fixed to surface by installer. Preferred method f fixing to flat surface is dependent on type of surface and available supports. ACAPELLA ACAPELLA installation manual installation manual...
  • Page 18 (see solar pipe page for further details). The swivel nut fitting on the solar pipe will screw directly onto on side of the collector system where the ¾” flat faced male thread connection is. A ¾” x ¾” flat face nipple must be used between the swivel nut on the collector and the swivel nut on the solar pipe. Connecting Panels Together The Acapella collector has a ¾” flat face male thread on one side and a swivel nut ¾” female on the other side. This means that each panel connects directly to the panel beside it. A fibre washer must be inserted between the flat face of the male thread and the internal of the female swivel nut. Insulation.
  • Page 19: Stainless Steel Solar Pipe

    Stainless Steel Solar Pipe Stainless Steel Pipe Specification Silicone Cable Specification Insulation Specification ACAPELLA ACAPELLA installation manual installation manual...
  • Page 20: Pump Station

    Pump Station The Joule product range offers both a single stream and a dual stream pump station. The flow rate required on a system is typically 1 litre per minute, per square metre installed. Therefore a 2-12 litre pump station will be sufficient for systems up to 12m². 1. Insulating box (back) in EPP 2. Safety unit consisting of: manometer 0/10 bar, solar safety valves cali- brated to 6 bars, 3/4” connection for expansion vessel 3. Security clips 4. Shutoff valves with integrated thermometers and check-valves 5. Solar pump 6. Visual flow balancing valve with filling and drain group 7. Hose connection 8. Insulating EPP box (cover) Connections of flow and return pipe work to the pump station are made vis the ¾” flat face thread connection on all points apart from the connection directly underneath the pump. This connection is to be made with 22mm smooth tube. When locating the pump station consideration should be given to future access for maintenance.
  • Page 21: Safety Vessel Connection

    It is recommended that the expansion vessel is located below the level of the connec- tion from the pump station to prolong its life. Temperature Reducing Vessel (TRV) Also known as a ‘cooling vessel’ or ‘stratification vessel’, the TRV is highly recommended where the distance between collectors and pump station is less than five meters. The TRV ensures that enough fluid is present between the collectors and expansion vessel to prevent damage to the expansion vessel membrane. PRV discharge point Wall bracket (supplied) Discharge container TRV kit Expansion vessel Dual stream pump station ACAPELLA ACAPELLA installation manual installation manual...
  • Page 22: Electrical Solar Controller

    In order to protect the normal operation of the control panel, it should be located at least 100 mm from in- sulated pipes which may become hot during operation. Control panels use PT1000 sensors containing twin core copper cable with a 0.75mm cross section. The sen- sors supplied are 1.5 metres in length. Sensor cables can be extended with twin core copper cable of 0.75mm diameter up to 50 metres and 1.50mm diameter between 50-100m. Screened cable should be used on the sensor cables to prevent RFI from electrical cables. All connections to extend the cables should be housed in a junction box for protection. The following diagrams show the connection of the solar pump and other relays on the Joule range of controllers. This should be read in conjunction with the Installation and Operation Manual supplied with each Joule control panel.
  • Page 23 ACAPELLA ACAPELLA installation manual installation manual...
  • Page 25 ACAPELLA ACAPELLA installation manual installation manual...
  • Page 26: Commissioning

    Commissioning Expansion Vessel IMPORTANT Prior to filling the system, the expansion vessel pressure must be set 0.3 Bar below the system pressure. Omitting to perform this check will result in irregular pressure readings during the commissioning of the system. The pressure is checked at the base of the vessel and the bleed valve may be bled or topped up with a pump. Filling the Loop It is important that a motorised flush and fill centre is used to fill and pressurise the system with solar fluid as follows: • Open the fill and drain valves to allow the liquid to circulate around the solar loop • Close the isolating valve above to the flow meter to ensure all air and liquid passes through the fill centre to filter any air and contaminants. • Run the fill centre pump to circulate solar fluid for approximately 60 minutes. • Open and close the isolating valve intermittently to circulate air bubbles which may accumulate in the sight glass. • Return isolating valve to closed position.
  • Page 27: Setting The Flow Rate

    3 seconds and the controller will enter the service menu. Press down through all options until option HND1 is visible. • Press the centre button once • SET begins to flash • When SET is flashing use the UP & DOWN arrow buttons to change the setting from AUTO to ON • Press the centre button to confirm • Pump will start to run and warning lights will flash to alert you to the fact that the pump is running continuously. • When finished carry out the above steps and change ON back to AUTO ACAPELLA ACAPELLA installation manual installation manual...
  • Page 28: Servicing And Maintenance

    Servicing and Maintenance Users should regularly check the temperatures which the solar control panel is re- cording. With the SC range of controllers, simply pressing the ‘SET’ button on the fascia once will display the upper and lower collector temperatures since the control panel was last reset.
  • Page 29 Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 comissioning Date of inspection Expansion vessel setting before filling System pressure Expansion vessel setting before filling Flow rate Antifreeze level pH reading Inspection of barium get- ter on tubes Engineer details Print name Sign Telephone No. ACAPELLA ACAPELLA installation manual installation manual...
  • Page 31 ACAPELLA ACAPELLA installation manual installation manual...
  • Page 32 JOULE IE Kylemore Park West, Ballyfermot, Dublin 10 +353 1 6237080 +353 1 6269337 info@joule.ie www.joulesolutions.ie JOULE UK Newport Business Park, Newbridge Road, Ellesmere Port, Cheshire, CH65 4LZ t +44 (0) 1513 551 094 +44 (0) 1513 568 336 info@jouleuk.co.uk www.jouleuk.co.uk JOULE PL 23-200 Kraśnik, ul. Towarowa 34. biuro@joule-pl.pl www.joule-pl.pl...