Advertisement

OPERATION GUIDE
EDR10512 r1 5/05
Document Part No. 99300805
www.lpadjustablebeds.com
© Leggett & Platt, Inc.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the s-cape II MR and is the answer not in the manual?

Questions and answers

Summary of Contents for wallhugger s-cape II MR

  • Page 1 OPERATION GUIDE EDR10512 r1 5/05 Document Part No. 99300805 www.lpadjustablebeds.com © Leggett & Platt, Inc.
  • Page 3: Table Of Contents

    Optional “J Box” Programming Procedure ............5 Powerdown Box Operation ................5 S-cape II MR Programming (1 hand control - 1 bed) ........6 S-cape II MR Programming (2 hand controls - 1 bed)........7 S-cape II MR Programming (1 hand control - 2 beds) ........8 S-cape II MR Programming (2 hand controls - 2 beds) ........
  • Page 4: S-Cape Ii Mr Function

    USING THIS PRODUCT. THE POTENTIAL FOR ELECTRICAL SHOCK EXISTS IF ELECTRICAL COMPONENTS ARE NOT INSTALLED OR OPERATED PROPERLY. S-CAPE II MR OPERATION Refer to the matrix below for location and explanation of the S-cape II MR hand control buttons: POSITION BUTTONS...
  • Page 5: Optional "J Box" Programming Procedure

    OPTIONAL “J BOX” PROGRAMMING PROCEDURE ALTERNATE “J BOX” PROGRAMMING For adjustable beds equipped with “J box” only—no power down box. When programming the hand control, At any point where “press the learn unplug the adjustable bed electrical power button” is designated, disconnecting and cord.
  • Page 6: S-Cape Ii Mr Programming 1 Hand Control - 1 Bed

    S-CAPE II MR PROGRAMMING 1 hand control - 1 bed The two step procedure below is required to program 1 hand control to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet.
  • Page 7: S-Cape Ii Mr Programming 2 Hand Controls - 1 Bed

    S-CAPE II MR PROGRAMMING 2 hand controls - 1 bed The three step procedure below is required to program 2 hand controls to operate 1 bed. Before beginning, make certain the bed is plugged into a working grounded electrical outlet.
  • Page 8: S-Cape Ii Mr Programming 1 Hand Control - 2 Beds

    S-CAPE II MR PROGRAMMING 1 hand control - 2 beds The three step procedure below is required to program 1 hand control to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet.
  • Page 9: S-Cape Ii Mr Programming 2 Hand Controls - 2 Beds

    S-CAPE II MR PROGRAMMING 2 hand controls - 2 beds The six step procedure below is required to program 2 hand controls to operate 2 beds. Before beginning, make certain the beds are plugged into a working grounded electrical outlet.
  • Page 10: S-Cape Ii Mr Reprogramming Separating 2 Beds

    S-CAPE II MR REPROGRAMMING separating 2 beds The six step procedure below is required to separate 2 hand controls from operating 2 beds. One hand control per bed operation will result. Before beginning, make certain the beds are plugged into a working grounded electrical outlet.

Table of Contents

Save PDF